SECI Issues RfS for 1200 MW Wind-Solar Hybrid Projects Updated On Wed, Jan 15th, 2020 by Saurenergy SECI has issued a Request for Selection (RfS) for setting up of a 1200 MW ISTS-Connected solar-wind hybrid power projects in India under Tranche-III. The Solar Energy Corporation of India (SECI) has issued a Request for Selection (RfS) for setting up of a 1200 MW ISTS-Connected solar-wind hybrid power projects in India under Tranche-III. The […] Read more
AAI Tenders for 1 MW Solar Plant at Begumpet Airport in Hyderabad Updated On Tue, Jan 14th, 2020 by Saurenergy AAI has issued a tender for the commissioning of a 1 MW grid-connected solar energy plant at the Begumpet Airport in Hyderabad. Airports Authority of India (AAI) has issued a tender, inviting bids from eligible firms for commissioning of a 1 MW grid-connected solar energy plant at the Begumpet Airport in Hyderabad. The scope of […] Read more
Carbon Tax Waiver may put Renewables Growth in India at Risk: Fitch Updated On Mon, Jan 6th, 2020 by Saurenergy Fitch Solutions believes that the centre’s proposed carbon tax waiver on coal may pose substantial downside risks to India’s renewable sector growth. Fitch Solutions has said that it believes that the centre’s proposed carbon tax waiver on coal may pose substantial downside risks to India’s renewable sector growth. In a bid to alleviate significant debt levels in the power industry, India has proposed […] Read more
BHEL Tenders for Floatation Platform for 22 MW Solar Project Updated On Mon, Jan 6th, 2020 by Saurenergy BHEL has tendered s for developing the complete floatation platform for the 22 MW floating solar plant at NTPC Kayamkulam in Kerala. Bharat Heavy Electricals Limited (BHEL), India’s largest engineering and manufacturing enterprise has issued a tender, inviting bids from eligible firms for developing and fabricating a complete floatation platform for the 22 MW floating […] Read more
SECI Issues RfS for 1200MW ISTS-Connected Solar Projects Updated On Sat, Jan 4th, 2020 by Saurenergy The last date for bid submission is February 04, 2020, and the earnest money deposited (EMD) is Rs 4 lakh per MW per project. State-owned Solar Energy Corporation of India (SECI) has issued its Request for Selection (RfS) document for the selection of developers to set up 1200 MW of ISTS-connected solar photovoltaic (PV) power […] Read more
Installed Renewable Energy Capacity in India now at 84.39 GW: MNRE Updated On Thu, Jan 2nd, 2020 by Saurenergy The installed renewable energy capacity in India had crossed 84 GW mark by the end of November 2019, as per fresh data released by MNRE. The installed and operational renewable energy (RE) capacity in India had crossed 84 gigawatts (GW) mark by the end of November 2019, fresh data released by the Ministry of New […] Read more
EESL Tenders for 1.8 Lakh Off-Grid Solar Pumps Under KUSUM Scheme Updated On Wed, Jan 1st, 2020 by Saurenergy EESL has tendered for the commissioning of over 1.8 lakh off-grid solar water pump systems across India under the PM KUSUM) scheme The Energy Efficiency Services Limited (EESL) has issued a tender, invited bids from eligible vendors for the supply and commissioning of over 1.8 lakh off-grid solar water pumps across India under the Pradhan […] Read more
Are lower margins making the Indian solar market unattractive? Updated On Thu, Dec 26th, 2019 by Saurenergy In recent years, Indian solar industry saw many ups and downs whether it would be related to implementation of GST, safeguard duty, dues on Discoms, renegotiation of PPAs, policy changes etc. Here’re some views and voices from the industry on the impact of margins due to ongoing developments: Amit Gupta, Director of Legal and Corporate […] Read more
The Potholes of 2019 for India’s Solar Drive Updated On Tue, Dec 24th, 2019 by Saurenergy Looking back at 2019, there is absolutely no doubt today, that it has not been a memorable year for Solar power in India. Generators or manufacturers. With a closing installation figure of barely 7 GW as tracked by us, almost every hope from 2018 has been belied. The bad part? Some of the biggest obstacles […] Read more