SECI Extends Deadline For 3 GW Manufacturing Linked Solar Tender Updated On Mon, Mar 18th, 2019 by Saurenergy The deadline for submission has been extended from March 18, 2019, to April 4, 2019. The Solar Energy Corporation of India (SECI) has extended the deadline for bid submission on its tender for setting up 3 GW ISTS-Connected solar PV power plant linked with setting up of 1.5 GW (per annum) solar manufacturing plant. The […] Read more
GAIL Floats Tender For Solar Systems on Maharashtra Region Pipeline Updated On Thu, Mar 14th, 2019 by Saurenergy The last date of bid submission is April 2, 2019. GAIL India Ltd., the largest state-owned natural gas processing and distribution company in India, has issued a tender for commissioning of solar PV power systems at seven locations of the Maharashtra region pipeline. The brief scope of work for selected bidders will include the supply, […] Read more
RfS For 1200 MW Solar Power Projects Released (ISTS-IV) Updated On Wed, Mar 13th, 2019 by Saurenergy The maximum tariff payable to the Project Developer is fixed at Rs 2.65/ kWh for 25 years. The Solar Energy Corporation of India (SECI) has released the detailed Request for Selection (RfS) document for selection of solar power developers (SPDs) for setting up of 1200 MW ISTS Connected Solar Power Projects (ISTS-IV) on a pan […] Read more
Coming up. A 100 MW Solar Park in Bangladesh with Saudi backing Updated On Tue, Mar 12th, 2019 by Saurenergy The AlFanar Group, a leading Saudi construction and manufacturing conglomerate, has agreed to provide a $100 million worth of financing for an upcoming solar project in Bangladesh. Financing has been a challenge for developers in Bangladesh, with projects struggling due to inability of the developers to raise funding.The Riyadh-based Alfanar signed a Memorandum of Understanding […] Read more
The Message from Gujarat. The Solar Price Squeeze to stay in 2019 Updated On Tue, Mar 12th, 2019 by Saurenergy After the boom of 2017, solar power developers in India ran into a big, if not completely unexpected problem. Government expectations of price drops, when it came to bidding at auctions. The cancellation of the 1000 MW auction by Gujarat Urja Vikas Nigam Limited (GUVNL), for its Dholera solar park site was on expected lines. […] Read more
SECI Issues Three NITs to Set-Up Solar Projects in UP, MP, Andhra Updated On Mon, Mar 11th, 2019 by Saurenergy The detailed Request for Selection Document (RfS) for all the three solar power projects in UP, MP and AP respectively will be available for download for interested bidders latest by April 30, 2019. The Solar Energy Corporation of India (SECI) has issued three Notice Inviting Tenders (NITs), inviting online bids for the development of solar PV […] Read more
5 Big Hurdles that have Emerged for India’s Solar Power Producers Updated On Mon, Mar 11th, 2019 by Saurenergy After installations of almost 10 GW and above in 2017 and close to 8 GW in 2018, the solar sector is facing its biggest challenge yet, as hurdles have emerged for the continued growth of the sector. Some of these challenges were always there, they are only bigger now, while others have emerged with time. […] Read more
Solar Tender For 60 MW Rooftop Projects Issued by REMCL Updated On Thu, Mar 7th, 2019 by Saurenergy The last date of bid submission is April 30, 2019. The Railway Energy Management Company Limited (REMCL), a joint venture of the Indian Railways and RITES Limited, has invited bids to set up total capacity of 60.17 MW of rooftop solar PV power projects on the rooftops of offices, buildings, and railway establishments across the zonal […] Read more
NIT For 1800 MW Wind Projects in India (Tranche-VIII) Updated On Thu, Mar 7th, 2019 by Saurenergy The detailed RfS Document shall be available for download by March 29, 2019. The Solar Energy Corporation of India (SECI) has issued tender inviting bids for setting up of 1800 MW ISTS-Connected Wind Power Projects (Tranche-VIII) on a pan India basis. The detailed Request for Selection (RfS) Document shall be available for downloading by March 29, 2019, onwards […] Read more