NEXTracker Achieves 1 GW of Solar Tracker Sales in India Updated On Tue, Jun 6th, 2017 by Saurenergy NEXTracker’s projects commissioned or under construction with Sterling & Wilson, Adani Green Energy, SkyPower, CleanMax Solar, Suzlon, and ReNew Power are milestones that demonstrate the rapidly growing adoption of solar trackers in India. NEXTracker has announced that it has sold over 1 gigawatt (GW) of solar trackers to utility-scale power plants in India. This achievement […] Read more
NISE Organizing 12th Three- Day Skill Development Program on Solar PV System Design Updated On Fri, Jun 2nd, 2017 by Saurenergy The vision of this 12th three- day skill development program on solar PV system design is to enable participants to “Design and Simulate SPV System NISE is organizing 12th three- day skill development program on solar PV system design using “PVSYST & PVSOL” software with cost economic and policies The main objective of this skill […] Read more
CertainTeed Launches US Series Solar Modules Updated On Thu, Jun 1st, 2017 by Saurenergy US Series 60 and 72-cell solar modules from CertainTeed are among the most efficient solar modules manufactured in the United States. CertainTeed Solar has announce its US Series 60 and 72-cell solar modules, with 60 cell power output reaching 305W and 72 cell power output of up to 365W. The US Series modules, which are […] Read more
IBC SOLAR Commission 22.5 MWp Solar PV project in Phalodi, Rajasthan Updated On Wed, May 31st, 2017 by Saurenergy IBC SOLAR in India had the lead and overall responsibility for the solar PV project, the engineering and technical supervision was done by the German parent company, who also provided some key components. IBC SOLAR has announced that it has commissioned its sixth solar PV power plant in Rajasthan in the north of India. The […] Read more
Solar Power Juggernaut Will Keep Rolling Despite Higher Taxes Under GST Updated On Sat, May 27th, 2017 by Saurenergy According to a list of 1,211 items released after the meeting of the GST Council, which comprises finance ministers of all the states of the Union, “Photosensitive semiconductor devices; including solar photovoltaic cells, whether or not assembled in modules or made up into panels”, will be charged at a rate of 18 Goods and Services […] Read more
CleanMax Solar signs MoU with Hitachi High-Tech to jointly offer high-end rooftop solar solutions Updated On Fri, May 26th, 2017 by Saurenergy CleanMax Solar and Hitachi High-Tech aims to enable Japanese corporates in India to adopt green energy practices by providing them solar power in a low-risk, economical and reliable manner Energy solutions provider CleanMax Solar has signed a memorandum of understanding (MoU) with Hitachi High-Technologies Corporation (Hitachi High-Tech) to jointly offer high-end rooftop solar solutions to […] Read more
Hevel Commissions 25 MW Solar Power Plant in South Western Russia Updated On Wed, May 24th, 2017 by Saurenergy The 25 MW Solar Power Plant has been commissioned at a cost of RUB 2.75 billion, and 70 percent of solar PV components used were manufactured in Russia. Hevel Solar, a joint venture between Russian industrial conglomerate Renova Group and nanotechnologies provider JSC Rusnano has commissioned a 25MW solar power plant in Sol-Iletsk, a town […] Read more
Solar Street Lighting Market to Reach US$ 22.30 Bn by 2025: Transparency Market Research Updated On Fri, May 12th, 2017 by Saurenergy Solar Street Lighting Market was valued at US$ 3.47 Bn in 2016 and is anticipated to reach US$ 22.30 Bn by 2025, expanding at a CAGR of 23.4% between 2017 and 2025. Transparency Market Research has published a new market report titled “Solar Street Lighting Market 2017-2025”. According to the report, the Solar Street Lighting Market was valued at US$ 3.47 Bn in […] Read more
NTPC Invites Tenders for Battery Energy Storage System for 17 MW Solar PV Project in South Andaman Updated On Thu, May 11th, 2017 by Saurenergy NTPC in its tender document has mentioned that the scope of work include design, engineering, installation, testing, grid integration with 17 MW solar PV Plant and 33 kV grid, of 6 MW, 24 MWh (at 33KV output throughout life of 25 Years) Battery Energy Storage System. NTPC Ltd. has invited online bids from eligible bidders […] Read more