Sun Technicians : Solar PV Utility &/or RoofTop Updated On Thu, Mar 4th, 2021 by Saurenergy Experience Minimum 1 year of experience on-ground. Qualification ITI – Electrical Key Responsibilities / Accountability Responsible for inspection, maintenance and repair of solar PV systems Identifies problems and develops corrective action plans Travel to project sites and vendor locations as assigned to perform all aspects of on-site operations & maintenance and breakdown maintenance activities, modifications as […] Read more
Sun Engineers : Solar PV Utility &/or RoofTop Updated On Thu, Mar 4th, 2021 by Saurenergy Key Responsibilities / Accountability Responsible for inspection, maintenance and repair of solar PV systems Identifies problems and develops corrective action plans Travel to project sites and vendor locations as assigned to perform all aspects of on-site installation, repair, maintenance, oversight, and modifications as required Work directly with client personnel and, as directed, third-party vendors to […] Read more
As Solar Spreads, Shrinking Space for Wind Updated On Wed, Mar 3rd, 2021 by Saurenergy It was one of the lesser noticed misses caused by the 2020 pandemic. In fact, we had predicted it in our own January 2020 issue. When Solar capacity would overtake wind in India. But come 2021, and wind energy has finally been overtaken. The news, when it was finally confirmed, couldn’t have been announced with […] Read more
Service Engineer for Solar Agriculture Pumpsets Updated On Mon, Mar 1st, 2021 by Saurenergy JOB ROLES & RESPONSIBILITIES: • Experience with test and analysis (troubleshooting) of electronics devices. • Proven experience assembling and disassembling power electronics hardware to applicable standards. • Understanding the concept of reverse engineering. • Ability to do Soldering and desoldering along with mounting manually. • Skill to conceptualize and communicate major elements of electrical design, […] Read more
Will Larger Solar Module Sizes Work For Everyone? Updated On Tue, Feb 23rd, 2021 by Saurenergy As Panel Sizes Grow, Time For A Reality Check For C&I Buyers & Residential homeowners looking for Rooftop Solar. The second half of 2020 marked a new shift in the solar module segment, with many manufacturers announcing the launch of bigger, better & higher output modules. Some have called these the next level of technology […] Read more
WEC Energy Announces Plan for Wisconsin’s 1st Large-Scale Solar and Storage Project Updated On Wed, Feb 17th, 2021 by Saurenergy WEC Energy Group today proposed plans for a new 310-megawatt (MW) solar and battery storage project. If approved, the Paris Solar-Battery Park in Kenosha County would be the largest facility of its kind in Wisconsin. The facility features 200 MW of solar generation — which is equal to powering 60,000 homes, and 110 MW of battery storage — which […] Read more
4789 MW RE Capacity Sanctioned Under Component A of KUSUM Scheme Updated On Fri, Feb 12th, 2021 by Saurenergy RK Singh has detailed that under Component-A of the KUSUM scheme 4789 MW of RE capacity has been sanctioned across farms in India, so far. Union Minister for Power and New & Renewable Energy RK Singh has detailed that under Component-A of the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) scheme 4789 MW […] Read more
Enphase Energy and Momentum Solar Expand Partnership to Include Battery Storage Updated On Thu, Feb 4th, 2021 by Saurenergy Enphase Energy, Inc., a global energy management technology company and the world’s leading supplier of microinverter-based solar-plus-storage systems, today announced that Momentum Solar, a top U.S. residential solar contractor and an Inc. 500 fastest-growing private company, will now promote and install Enphase Storage systems in addition to Enphase Solar systems as their all-in-one home energy […] Read more
TANGEDCO Tenders for 500 MW Solar Projects Under KUSUM Scheme in TN Updated On Wed, Feb 3rd, 2021 by Saurenergy TANGEDCO has tendered for 1 MW to 2 MW solar projects for a cumulative 500 MW capacity under Component- A of the PM KUSUM scheme in Tamil Nadu. The Tamil Nadu Generation and Distribution Company (TANGEDCO) has issued a tender, seeking bids from eligible bidders for setting up of solar power projects of capacity 1 […] Read more