MNRE Minister Bhagwant Khuba At Intersolar Europe Updated On Fri, May 13th, 2022 by Saurenergy Union Minister of State for Ministry of New and Renewable Energy, Bhagwant Khuba attended the Intersolar Europe 2022 held at Munich, Germany. The Minister delivered key note address at the investment promotion event on “India’s Solar Energy Market”. Bhagwant Khuba in his key note address said that ‘As Hon’ble PM Modiji’s ambitious Panchamrit targets set […] Read more
US probe into solar imports threatens almost 2/3 of planned capacity additions in 2022: Rystad Energy Updated On Wed, May 11th, 2022 by Saurenergy As much as 17.5 gigawatts (GWac) of planned US solar capacity installations in 2022 are in doubt after the Department of Commerce (DOC) opened an investigation into panel imports from southeast Asia, Norway-based Rystad Energy research shows. The US was expected to install 27 GWac of solar energy capacity in the utility, residential, and commercial […] Read more
Bids For 1250 MW Solar Plants Under PMKUSUM-C Invited in Madhya Pradesh Updated On Tue, May 10th, 2022 by Saurenergy Madhya Pradesh Urja Vikas Nigam Limited (MPUVNL) has invited bids for the selection of Renewable Power Generators (RPGs) through tender process for setting up 1250 MW grid-connected Solar PV-based Power Plants (SPP) connected to selected 33/ 11 kV substation in Madhya Pradesh. MPUVNL will sell the solar power so procured to Madhya Pradesh Power Management Company Limited (MPPMCL) […] Read more
MSEDCL floats 431 MW solar tender in Maharashtra Updated On Mon, May 9th, 2022 by Saurenergy Maharashtra State Electricity Distribution Co. Ltd. (MSEDCL) has invited bids for the procurement of 431 MW solar power from decentralised solar projects of minimum 0.5 MW to maximum 2 MW capacity under component-A of PM Kusum Scheme to be developed in Maharashtra. Key details of the tender released by MSEDCL are as follows: Pre-bid Conference Meeting Date […] Read more
Bosch to invest €500 million to develop components for hydrogen electrolysis Updated On Fri, May 6th, 2022 by Saurenergy Bosch has announced that it will be investing €500 million to develop components for hydrogen electrolysis by the end of this decade that will help heighten green hydrogen production that will be used in transport and different sectors. A stack is the core component of an electrolyzer. Bosch has revealed in its annual information convention […] Read more
TANGEDCO To Add 3 MW Solar Power Under PM-KUSUM Scheme Updated On Mon, May 2nd, 2022 by Saurenergy The Tamil Nadu Electricity Regulatory Commission(TNERC) has allowed the Tamil Nadu Generation and Distribution Corporation Ltd (Tangedco) to procure solar power with a combined capacity of 3 MW generated by two farmers in the state. The solar power will be purchased at a tariff of Rs 2.99 per unit, under Component – A of the […] Read more
Jakson Group wins bid for O&M of NTPC Bhadla Solar Power Plant Updated On Fri, Apr 29th, 2022 by Saurenergy To strengthen its legacy as an energy solution provider, Jakson Group, one of the India’s fastest-growing energy companies, won a bid for comprehensive Operation and Maintenance (O&M) for 260 MW Bhadla Solar PV Plant located at Bhadla Solar Park in BAP, Rajasthan. Jakson Group will have the responsibility to continuously monitor the site for all […] Read more
Solar Inverters Move to The Front Updated On Wed, Apr 27th, 2022 by Saurenergy When it comes to the Solar market, a disproportionate share of attention is always paid to the modules, or more recently, the module supply chain. The global solar PV module market was valued at $127.9 billion in 2020, and is projected to reach $260.2 billion by 2030, growing at a CAGR of 7.4% from 2021 […] Read more
First Solar to Supply 1GW Solar Module to Leeward Renewable Energy Updated On Wed, Apr 27th, 2022 by Saurenergy Renewable energy players First Solar and Leeward Renewable Energy (LRE) have signed an agreement under which First Solar will supply 1 GW of advanced, ultra-low carbon and thin-film PV solar modules to Leeward. The official statement of the companies says that LRE will deploy these modules across its 20GW solar development and construction pipeline in […] Read more