The Transition to EVs in India Will Require Rs 19.7 Lakh Crore Investment: Report Updated On Tue, Feb 2nd, 2021 by Saurenergy The transition to EVs in India will require a cumulative investment of Rs 19.7 lakh crore in EVs, charging infrastructure, & batteries by 2030 A new report by NITI Aayog and Rocky Mountain Institute (RMI) has found that the transition to electric vehicles (EVs) in India will require a cumulative capital investment of USD 266 billion (Rs 19.7 lakh crore) in EVs, […] Read more
Senior Manager – Supply Quality (Electrical) Updated On Wed, Jan 27th, 2021 by Saurenergy Roles & Responsibilities: Understanding customer requirements during bidding, highlighting deviation approvals required if any. Budget preparations for material inspections in project execution. New Vendor assessments proposed by procurement. Preparation of MQAP / Revision w.r.t to learnings at frequent intervals. Failure analysis with vendors if any during FAT, Stage insp. & Type Test. Material stage & […] Read more
EV Sector Hopes For Charging Push, targeted Incentives From Budget 2021 Updated On Wed, Jan 27th, 2021 by Saurenergy With just 5 days to go for Budget 2021 every citizen, expectations have rarely been so high from the government. And the reason is not just the repair work from the shock of Covid 19 has delivered. For once, people seem to realise that the government will actually have some leeway to break some self […] Read more
FTM Storage Costs to Decline 30% by 2025 in Asia Pacific: WoodMac Updated On Wed, Jan 20th, 2021 by Saurenergy All-in FTM battery storage system costs in Asia Pacific markets could decline by more than 30 percent by 2025, as per Wood Mackenzie. All-in front-of-the-meter (FTM) battery storage system costs in Asia Pacific markets could decline by more than 30 percent by 2025, according to research and consultancy firm Wood Mackenzie. Storage system prices fell […] Read more
229.25 RE Capacity Added in First 10 Months of FY21 in Andhra Pradesh Updated On Wed, Jan 20th, 2021 by Saurenergy Data from NREDCAP has revealed that in the first 10 months of the FY21, Andhra Pradesh had 229.25 MW of RE capacity connected to its grid. The New and Renewable Energy Development Corporation of AP (NREDCAP) has issued the updated status of renewable energy (RE) projects commissioned in the state of Andhra Pradesh (until January […] Read more
EESL, NIIF JV ‘Intellismart’ to Develop Digital Platform for Distribution Sector Updated On Mon, Jan 18th, 2021 by Saurenergy IntelliSmart, a JV of EESL & NIIF has committed to developing a digital platform for value-added services in the distribution & power sector IntelliSmart Infrastructure Private Limited, a JV of Energy Efficiency Services Limited (EESL) and National Investment & Infrastructure Fund (NIIF) has committed to developing a digital platform for value added services in the […] Read more
Total and Engie to Develop France’s Largest Renewable Hydrogen Site Updated On Wed, Jan 13th, 2021 by Saurenergy Total and Engie have signed a cooperation agreement to build and operate France’s largest renewable hydrogen production site Total and Engie have signed a cooperation agreement to design, develop, build and operate the Masshylia project, France’s largest renewable hydrogen production site at Châteauneuf-les-Martigues in the Provence-Alpes-Côte d’Azur South region. Located at the heart of Total’s […] Read more
Saving Your Rooftop PV Plant From a Lighting Strike Updated On Sat, Jan 9th, 2021 by Saurenergy Background Residential PV systems are generally installed on the rooftop of residential buildings, with a large metal surface area, higher distance from the ground and exposed location. That makes these PV systems a possible target for lightning during thunderstorms. Thus, having good lightning protection and grounding becomes key to avoid any incidents that could cause […] Read more
Senior Position – Design & Engineering Updated On Sat, Jan 9th, 2021 by Saurenergy Incumbent will be responsible for: Familiarity with present codes & practices for designing Electrical & Civil Mounting Structures. Familiar with pre-bid & post bid engineering & technical evaluation of proposals. Thorough knowledge of Solar System, Power evacuation, PV panels, SCADA systems, AC/DC Cabling & Sizing, Switch Yard and other equipment. Equipment Co-ordination of site, service […] Read more