SUBSCRIBE NEWS LETTER

solar component

MNRE Issues Guidelines For PM-KUSUM Scheme At Feeder Level

The Ministry of New and Renewable (MNRE), after consultation with state governments, has decided to issue Guidelines for Implementation of Feeder Level Solarisation under Component-C of PM-KUSUM Scheme. The Scheme consists of three components. Component-A includes installation of Decentralized Ground Mounted Grid Connected Renewable Power Plants, Component-B includes installation of standalone Solar Powered Agriculture Pumps […]

Read more

FTI Consulting Unveils India Green Hydrogen Roadmap Report

FTI Consulting recently unveiled its India Green Hydrogen Roadmap report, proposing a target of 4 percent for hydrogen energy in the national energy mix by 2030. FTI Consulting recently unveiled its India Green Hydrogen Roadmap report. The report proposes a target of 4 percent for hydrogen energy in the national energy mix by 2030 and […]

Read more

Preparing For a Renewable Future- The Business Models That Matter

If there is one thing the renewable energy sector cannot be accused of doing, it is to look back too much. The solar sector in particular has everything to look forward to, considering the strong momentum it has built up globally. The Covid-19 crisis has only sharpened those opportunities, and possibilities of even more support […]

Read more

Leeward Renewable Energy Completes Repowering of Sweetwater 3 Wind Farm

Leeward Renewable Energy, has announced the successful completion, in late September, of the repowering and final financial close of its Sweetwater 3 Wind Farm (“Sweetwater 3”) in Nolan County, Texas. Leeward procured the wind turbine equipment from GE Renewable Energy, which also provided construction services and is providing operations and maintenance services for the project. […]

Read more

MNRE’s October 2020 Report Card For Cabinet

In its’s monthly report for the union Cabinet, the R.K Singh led MNRE has highlighted key monthly achievements for October this year.  While the success with minimising Covid impact has been set off by the lingering issues on other fronts  that have caused a slowdown in fresh capacity installation, the MNRE does have a potential […]

Read more

With New Target Of 30.8 GW by 2022, Changes In KUSUM Scheme Follow

Close on the heels of a sanction from the President of India on expanding the scope of the PM KUSUM Scheme, the MNRE has come up with a fresh set of changes to the scheme, that will seek to enhance its reach and appeal to users. The changes, in quick succession, make it clear that […]

Read more

NITI Aayog Drafts RfP for Setting up Advance Chemistry Cell Manufacturing Facilities

Niti Aayog has issued the draft RfP for the selection of private entities to set-up manufacturing facilities that produce Advance Chemistry Cells (ACC). The Government of India through the Department of Heavy Industry (DHI) intends to develop giga-scale advance cell manufacturing for domestic application and promotion of diverse energy sources, to ensure overall energy security […]

Read more

GoodWe Adds to its Utility Portfolio With Launch of HT Series 1500V PV String Inverter

On Friday 6 November the Indian solar industry witnessed GoodWe’s nationwide launch of the much anticipated HT Series. The Suzhou-based multinational is widely recognized as a global leader in Commercial & Industrial projects but has recently been adding to its Utility portfolio with larger and more powerful solutions. The event, held at the Pullman resort […]

Read more

EVs Most Practical Vehicle Tech to Tackle Air Pollution in India: TERI

“Electric vehicles (EVs) are by far the most practical vehicle technology intervention to address rising air pollution in the cities across India.” The Energy and Resources Institute (TERI) has developed the Digital Library on Green Mobility (DLGM) under the India component of the Nationally Determined Contributions (NDC)-Transport Initiative for Asia (TIA) programme. Speaking at the […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll