System Design Engineer Updated On Wed, Apr 12th, 2023 by Saurenergy In-house drawings and technical specifications for electrical works (BOM, BOQ, RFP) Design & Drawing of electrical systems for medium and large-scale PV systems (DC, AC, LV, HV, communication systems/SCADA, Earthing, Lightning protection and Illumination Calculation). Preparation of Design Documents such as RFP, GTP etc. Preparation of drawing for various projects such as Conceptualization, Tendering, Execution […] Read more
Robotic Cleaning Represents Only 1-2% Of overall Capex, But Can Be Decisive: Amit Singla, Ecoppia India Updated On Wed, Apr 12th, 2023 by Saurenergy Israeli firm Ecoppia offers AI, data-driven robotic solar panel cleaning solutions. It claims to have deployed 3,900 MW of projects, over 10.5 mn autonomous cleaning sessions and cleaned over 9.24 bn solar panels. The firm, which has a global presence, is expanding operations in India. Some of the firm’s clients from India include NTPC, Azure […] Read more
Engineering Manager-Hydro Updated On Wed, Apr 12th, 2023 by Saurenergy In the role as an Engineering Manager-Hydro, we are seeking a competent, self-driven and committed individual to ensure that projects under development and construction receive the required support in areas of hydropower planning, design related issues and reporting to Statkraft standards. The Hydro Power Engineer will be an integral role in technical team during all phases of M&A, project […] Read more
Shipments of 210 MM Modules Top 120 GW, Large-Format Products Dominate with over 90% Updated On Tue, Apr 11th, 2023 by Saurenergy As per TrendForce, a new energy research agency, total shipments of 210 mm modules have crossed 120 GW. The power of 210 mm n-type modules has passed 700W. Forecasts for 2023 TrendForce says in its recent report that in 2023, large-format wafers, cells and modules will account for more than 90% of the total production […] Read more
Sterling & Wilson Selects Nextracker for NTPC REL’s 1.255 GW/1.568 GW Project Updated On Thu, Mar 30th, 2023 by Saurenergy A provider of solar tracker and software solutions, Nextracker, has announced the signing of an agreement with Sterling and Wilson Renewable Energy Limited, which is renewable energy EPC and O&M solutions provider. Nextracker will deliver its solar trackers to NTPC Renewable Energy Limited’s 1.255 GW solar PV project in Khavda Renewable Energy Park, Gujarat. Sterling […] Read more
Fujiyama Launches 5 New E-Scooters in India with Prices Starting Rs 49,499 Updated On Thu, Mar 30th, 2023 by Saurenergy India’s e-scooter manufacturing firm, Fujiyama has introduced five electric scooters in India. The firm will begin with introductory offer prices ranging between Rs 49,499 to Rs 99,999 for the e-scooters. Amongst the five models launched, four are low-speed models viz. Spectra Pro, Spectra, Vespar, Thunder models. One is a high-speed model called Ozone+. As per […] Read more
SparkCognition Adds GPT Capabilities To Renewable Suite Updated On Wed, Mar 29th, 2023 by Saurenergy Texas, US based, SparkCognition, a leader in artificial intelligence (AI) software solutions perfected for business, today announced the addition of generative pre-trained transformer (GPT) capabilities to their Renewable Suite. This new feature will help accelerate time to value by delivering actionable insights for their renewable asset performance management (APM) solution. SparkCognition’s GPT, part of the Generative […] Read more
EV Maker Wardwizard Operationalises Lithium-ion Battery Unit in Vadodara Updated On Mon, Mar 27th, 2023 by Saurenergy Electric vehicle manufacturer Wardwizard Innovations and Mobility has announced that it has begun the operations of its lithium-ion battery assembly facility at Vadodara in Gujarat. The assembly line has been in-built by the company at its EV ancillary cluster and has an annual production capacity of 1 GWh. Wardwizard had announced about the company’s plan […] Read more
Goswami Electricals & Construction Emerges Lowest Bidder for WBSEDCL 10 MW Tender Updated On Mon, Mar 27th, 2023 by Saurenergy West Bengal State Electricity Distribution Company Limited had recently issued a tender for three years of operation and maintenance works of existing 10 MW solar power plant with associated equipment and materials at Charrah in Purulia. Goswami Electricals & Construction emerged as the lowest bidder that won the project for two years of O&M. The […] Read more