Sungrow Liquid-Cooled ESS PowerTitan 2.0 Shakes Up Energy Storage Market Updated On Fri, Sep 27th, 2024 by Saurenergy Recently, Sungrow, the world’s leading inverter seller in 2023, delivered 66 sets of its energy storage system, PowerTitan 2.0, in the UK, demonstrating its acceleration of energy storage deployment in Europe. In the Middle East, over 1,500 sets of PowerTitan 2.0 are set for deployment, contributing to one of the world’s largest energy storage projects […] Read more
Senior Performance Analyst Updated On Wed, Sep 25th, 2024 by Saurenergy The principle responsibilities essentially includes:- Responsible for conducting performance analysis of solar PV plants in operation which would essentially include Analysis and development of meteorological files for use in simulation software. Analysis of energy production data from PV projects, including comparison of operating vs. modelled data, downtime analyses. Statistical Analysis of Long Term Energy Yields […] Read more
Kerala Plans To Use BESS At Trivandrum Hospital On Pilot Basis Updated On Mon, Sep 23rd, 2024 by Saurenergy The Kerala government has decided to use solar power and battery energy storage systems in a pilot project. As per the plan, the Agency for New and Renewable Energy Research & Technology (ANERT) will execute the project in a Trivandrum Hospital. This pilot project will be executed under the Smart City Programme for Thiruvananthapuram. The […] Read more
US-India Launch $1 Bn Initiative To Build Clean Supply Chains Updated On Mon, Sep 23rd, 2024 by Saurenergy The United States (US) and India elevate and expand bilateral technical, financial, and policy support to enhance the complementary manufacturing capacity of clean energy technologies and components. This policy also lays the groundwork for enhanced cooperation and partnerships in Africa. The Strategic Clean Energy Partnership, led by the US Department of Energy and Indian government […] Read more
Hybrid Inverters Allowed Under PM Surya Ghar Scheme: MNRE Updated On Mon, Sep 23rd, 2024 by Saurenergy The Ministry of New and Renewable Energy (MNRE) recently released a document clarifying operational guidelines on the implementation of the PM Surya Ghar: Muft Bijli Yojana. The new clause widened the technologies included under the CFA offered to residential consumers. The new clause as per the latest document issued by the MNRE included additional technologies […] Read more
Cygni, HiNa To Bring India-Specific Sodium-ion Energy Solutions Updated On Tue, Sep 17th, 2024 by Saurenergy Cygni Energy Private Limited, a Hyderabad-based energy storage solutions player has planned to collaborate with HiNa to develop India-specific Sodium-ion based storage solutions. This storage solution is cheaper, safer, and allows 20-minute charging. Cygni Energy has been an advocate of Sodium-ion-based solutions and a challenger to Lithium for specific applications. As part of this partnership, […] Read more
Manager Renewable Engineering (Control & Instrumentation Engineer) Updated On Tue, Sep 17th, 2024 by Saurenergy We are seeking a leading role in the Renewable Engineering Control & Instrumentation (C&I) division for our Renewable Energy (RE) Power Plants which will be a mix of Solar, Wind, and BESS systems. This position is responsible for C&I engineering which includes major development of control architecture of complete solar + wind + BESS Hybrid […] Read more
System Design Engineer Updated On Tue, Sep 17th, 2024 by Saurenergy Roles & Responsibilities:- In-house drawings and technical specifications for electrical works (BOM, BOQ, RFP) Design & Drawing of electrical systems for medium and large-scale PV systems (DC, AC, LV, HV, communication systems/SCADA, Earthing, Lightning protection and Illumination Calculation). Preparation of Design Documents such as RFP, GTP etc. Preparation of drawing for various projects such as […] Read more
SECI Issues Fresh FDRE Tender For 8 GWh (2GW x 4 hours) Updated On Fri, Sep 13th, 2024 by Saurenergy The Solar Energy Corporation of India (SECI) has announced a Firm and Dispatchable Renewable Energy (FDRE) tender for peak supply totaling 8,000 MWh (2,000 MW x 4 hours). The project will be developed on a Build Own Operate (BOO) basis. SECI intends to sign a Power Purchase Agreement (PPA) with the successful bidders for a […] Read more