Associate Tech Lead – Electrical Engineering Updated On Thu, Jun 20th, 2024 by Saurenergy Associate Tech Lead will work as part of the Electrical Engineering team and have responsibility for the design and development of Electrical Subsystems for various product lines (New Product Developments (NPD), Quality improvement and Productivity projects). The role will have strong focus on new technologies, processes and applying these technologies to various product lines. Responsibilities:- Design […] Read more
Zetwerk Owned Unimacts Opens Second US Plant For Nextracker Updated On Wed, Jun 19th, 2024 by Saurenergy Unimacts, a manufacturing services company that was acquired by Indian contract manufacturing startup Zetwerk in 2022, has expanded its relationship with leading US solar tracker maker Nextracker. Unimacts has opened up its second manufacturing facility in Sloan, Nevada for Nextracker to make steel torque tubes, a key component of Nextracker’s solar trackers. This new facility […] Read more
Senior Manager – Materials Planning & Project Deliveries Updated On Tue, Jun 18th, 2024 by Saurenergy The Senior Manager – Materials Planning & Project Deliveries will be based in Hyderabad. In this position, you will report to the Head of APAC Planning. We are looking for a dynamic supply chain professional to lead supply & delivery planning activities within materials planning department. This individual will own customer order fulfilment for solar […] Read more
SaurEnergy Explains: Why Is PVEL Scorecard Important For Indian Manufacturers? Updated On Mon, Jun 10th, 2024 by Saurenergy PV Evolution Labs (PVEL), an autonomous testing facility catering to the downstream solar industry and affiliated with the Kiwa Group, has released its newest PV Module Reliability Scorecard. The latest edition of the annual scorecard highlights 388 model types of PV modules from 53 manufacturers as Top Performers in PVEL’s rigorous testing. This year’s list […] Read more
Sterlite Gets Rs 1373 Cr for 6000 MVA Neemrana Transmission Project Updated On Wed, Jun 5th, 2024 by Saurenergy The Neemrana II Kotputli Transmission Limited (NKTL) project has closed the financing transaction, according to Sterlite Power, a well-known operator in the power transmission industry. The enterprise has achieved a significant milestone with the acquisition of a sizeable sum of INR 1373 crore from Power Finance Corporation (PFC), a prestigious Maharatna Public Sector Enterprise. The […] Read more
Changing Dynamics: Indian Green Firms Shift Focus On Energy Storage Updated On Fri, May 31st, 2024 by Saurenergy In March 2022, India’s leading renewable energy company Adani Green Energy Limited (AGEL) collaborated with another Indian leading player in the energy storage systems–Greenko. The partnership was to seek the Hyderabad-based company’s assistance in getting Round-The-Clock (RTC) power for AGEL’s projects through Greenko’s PSP assets. PSPs are often termed as giant batteries which can storage […] Read more
Mechanical Test Engineer Updated On Thu, May 30th, 2024 by Saurenergy Complete product testing and qualification as per test requirements. Setup the test rig along with fixtures for component qualification. Analyze the test results using the relevant test software. Create and publish the test reports. Designing the test fixtures. Modelling the tracker parts and creating component & assembly drawings. Support engineering teams with fixture design and […] Read more
Design Engineer – Mechanical/Sustainable Engineering Updated On Thu, May 30th, 2024 by Saurenergy The Design Engineer will be based in Hyderabad. In this position, you will report to the Manager – Mechanical Engineering. This position will work on product development, design optimization, prototype generation, creating manufacturing drawings, perform FEA and assist in prototypes in testing facility to meet ensure minimum product standard before product release. Watch this video […] Read more
RWE To Build 1.6 GW Wind Farm Off German North Sea Updated On Wed, May 29th, 2024 by Saurenergy RWE has made the investment decision for its Nordseecluster, involving offshore wind projects with a total capacity of 1.6 gigawatts (GW). The wind farms will be built in the North Sea, about 50 kilometres north of the island of Juist. Suppliers of the main components have already been selected for the cluster as a whole. […] Read more