Bihar Seeks Bids For 564 MW Solar Projects Under PM KUSUM Updated On Thu, Mar 28th, 2024 by Saurenergy Component C of the PMKUSUM scheme, which seeks grid connected solar pumps as part of the same (Component B is off grid pumps and Component A is ground mounted solar ), is in the limelight in Bihar. Bihar State Power Generation Company (BSPGCL) has invited bids for 564 MW of projects under the scheme, in […] Read more
MNRE Amends Rules For Solar Mini-Grid Installations In Tribal Area Updated On Wed, Mar 27th, 2024 by Saurenergy In a notification released on March 26, the Ministry of New and Renewable Energy (MNRE) amended the dedicated scheme aimed at electrification of unelectrified households belonging to Particularly Vulnerable Tribal Groups (PVTGs). This initiative was launched under the Pradhan Mantri Janjati Adivasi Nyaya Maha Abhiyan (PM JANMAN) on January 4th. According to the original notification […] Read more
US Makers Face Challenges From Cheap Chinese Solar Products: Report Updated On Tue, Mar 26th, 2024 by Saurenergy A recent report by SEMA collation on the state of US PV solar manufacturing discussed the importance of developing a domestic solar manufacturing supply chain in the United States. The report discussed the steps required to reduce dependency on foreign sources, particularly China, and to strengthen the country’s position in clean energy. The report shared […] Read more
US Solar Manufacturers Come Out With Prescription for Domestic Manufacturing Updated On Tue, Mar 26th, 2024 by Saurenergy A new report commissioned by the Solar Energy Manufacturers for America (SEMA) Coalition and authored by Guidehouse Insights Inflection Point makes a case for stronger government efforts to ensure the US domestic solar manufacturing industry withstands the challenge mounted from China or Chinese linked imports. “Thanks to the efforts of Congress and the Administration, with […] Read more
Alpex Solar Bags Two Order Under PM-KUSUM Scheme In Haryana Updated On Tue, Mar 19th, 2024 by Saurenergy Noida-based Solar sector company Alpex Solar Limited has announced that it has secured an order from the Department of New & Renewable Energy Haryana (HAREDA), under the Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM Scheme), for the provision of 1434 solar water pumping systems. The systems will further be deployed for agricultural purposes. […] Read more
GameChange, Waaree Collaborate To Supply Solar Trackers To ACCIONA Updated On Tue, Mar 19th, 2024 by Saurenergy GameChange Solar a fixed tilt and tracker solar racking systems manufacturer has announced the signing of a contract with EPC Waaree Renewable Technologies Ltd. The company stated on its social media platform, “GameChange Solar has signed a contract with EPC Waaree Renewable Technologies Ltd to supply its Genius Tracker solar trackers for project developer ACCIONA Energía‘s new 412.5 MWp […] Read more
PM Surya Ghar: Govt Earmarks Rs 800cr For Model Solar Villages Updated On Mon, Mar 18th, 2024 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has now issued its notification for the rollout of its ambitious PM Surya Ghar: Muft Bijli Yojana. The ambitious scheme has planned to install rooftop solar panels onto one crore households with a financial output of Rs 75,021 crore. The ministry in its detailed financial outlay said […] Read more
Delhi Solar Policy Interlinks DISCOMs, Consumers, Reduces Upfront Cost Updated On Fri, Mar 15th, 2024 by Saurenergy Department of Power under the Delhi government recently released the Delhi Solar Policy. Under this new policy, the government introduced a hybrid RESCO model. This model establishes a tripartite link among DISCOMs, consumers, and RESCO developers through a Power Purchase Agreement (PPA). The revised model can facilitate solar panel installation on consumer rooftops without upfront […] Read more
L&T Emerges Lowest Bidder For 100 MW Jharkhand Floating Solar Project Updated On Tue, Mar 12th, 2024 by Saurenergy Solar Energy Corporation of India Limited (SECI), announced Larsen and Toubro (L&T) Limited as the most advantageous and lowest L1 successful bidder for a 100 MW floating solar PV project. SECI commissioned this project for operation and management (O&M) design, engineering, supply, construction, erection, testing, and commissioning of the floating solar project for five years. […] Read more