SolarPower Europe Unveils Digital Agrivoltaics Map Updated On Tue, May 21st, 2024 by Saurenergy Solar trade body SolarPower Europe has launched a digital map to showcase agrivoltaics projects in ten countries in Europe, including Italy, France, Germany and the Netherlands. The map includes more than 200 projects across the continent, amassing a combined capacity of 2.8 gW. The map showcases various technologies used in agriPV projects, whether it be […] Read more
NHPC Opens Bids For 200 MW Solar Project In Khavda, Gujarat Updated On Mon, May 20th, 2024 by Saurenergy National Hydroelectric Power Corporation (NHPC) has invited bids for the commissioning of a 200 MW grid-connected solar PV power project in Gujarat State Electricity Corporation Limited (GSECL) renewable energy (RE) solar parks at Khavda, Gujarat (Stage-3) with operation and maintenance for 5 yrs. The NHPC tender was released on 17 May 2024 at 06:30 PM […] Read more
Construction Of 2GW Offshore Solar Plant In China Starts Updated On Mon, May 20th, 2024 by Saurenergy China National Nuclear Power (CNNP) has kicked off the construction of the country’s largest offshore solar power plant next to the company’s nuclear power station in eastern Jiangsu province. Called the Tianwan Offshore Photovoltaic Power Station, the 2 GW solar project entails an investment of CNY9.9 billion (USD1.4 billion) and comes with a 400 MWh […] Read more
Senior HV Engineer – Solar Systems Specialist Updated On Wed, May 15th, 2024 by Saurenergy Responsibilities:- Electrical System Design: Design of electrical power system for Solar PV projects ranging from LV to HV AC – including but not limited to – power evacuation SLD, transformer sizing, conductor sizing, switch gear and protection system design, transmission line design. Equipment Sizing & selection: Determine the appropriate sizing of electrical equipments, including but […] Read more
Grew Energy To Set Up 3.2 GW Solar Module Manufacturing Facility In J&K Updated On Fri, May 10th, 2024 by Saurenergy Grew Energy Pvt Ltd – a flagship venture of the Chiripal Group – is all set to establish a three-stage fully backward integrated solar module manufacturing unit in Jammu & Kashmir. With a commitment to invest 4500 Cr, upon completion, this ultra-modern facility will have an annual capacity of producing 3.2GW high-efficiency solar modules and […] Read more
The Renewable Energy Developers Whose Plans Will Shape India’s Solar Targets Updated On Thu, May 9th, 2024 by Saurenergy India reached a notable milestone in renewable energy by adding a record-breaking 18.48 GW in 2023-24, a 21 per cent increase from the previous year. As of March 31, 2024, India’s installed renewable energy capacity stood at 143.64 GW, excluding large hydropower projects. The country needs an annual addition of at least 50 GW for […] Read more
Production Head – Solar Cell Manufacturing Updated On Wed, May 1st, 2024 by Saurenergy Role & Responsibilities:- Preferably knowledge of existing and emerging cell technology like PERC, TOPCON, HJT. · Responsible for Proper Manpower Planning in Cell Line area for smooth and safe operation. · Responsible for maintaining discipline in chemical handling/draining / treatment · Leading role along with Process/quality department for implementing new/Improved process · Responsible for meeting […] Read more
Amara Raja Infra Wins Greenko’s 700MWp Solar Project Updated On Mon, Apr 22nd, 2024 by Saurenergy Amara Raja Infra Private Limited (ARIPL), part of the $1.75 billion Amara Raja Group, has achieved a significant milestone in its journey in the renewable energy sector by securing a solar BoS project of 500MW/700MWp from Greenko. The project, spanning across a 2,200-acre site near Uyyalavada Town, Kurnool District, Andhra Pradesh, marks ARIPL’s largest capacity […] Read more
Everything You Wanted To Know About India’s Biggest Rooftop Solar Scheme Updated On Fri, Apr 19th, 2024 by Saurenergy Made For, Of and By India One of the biggest aspects of the PM Surya Ghar Scheme is the focus on mass markets, by limiting subsidies to systems upto 3kW in size. It is also meant to be a catalyst for India’s domestic manufacturing base for solar equipment, which has struggled to counter Chinese imports […] Read more