Adani Green Energy Commissions 25 MW Solar Plant in Uttar Pradesh Updated On Mon, Jan 11th, 2021 by Saurenergy Adani Green Energy has commissioned a 25 MW solar power plant in Chitrakoot, Uttar Pradesh, executing a PPA with NPCL at Rs 3.08/kWh. Adani Solar Energy Chitrakoot One Limited, a step-down subsidiary of Adani Green Energy Limited (AGEL) has commissioned a 25 MW solar power plant in Chitrakoot, Uttar Pradesh. The firm has executed a […] Read more
Arctech Solar Trackers Lead Among Those Used At 3.2GW Solar Park in China Updated On Mon, Dec 14th, 2020 by Saurenergy Arctech Solar has delivered its advanced 1P tracker SkyLine to a 3.2GW solar park, declared on 11th December 2020. The park, now the world’s largest solar plant located in Qinghai, China was connected to the grid last month. Arctech has been a focused player in the solar tracker space, which has expanded its offerings to […] Read more
Aptera Reveals First Never Charge Solar Electric Vehicle Updated On Mon, Dec 7th, 2020 by Saurenergy Aptera Motors has introduced the first solar electric vehicle that requires no charging for most daily use and boasts a range of 1000 miles per charge. Aptera Motors has announced it has introduced the first solar electric vehicle (sEV) that requires no charging for most daily use and boasts a range of up to 1,000 […] Read more
As Battery Cell Prices Hit $110/KWH, Challenges Remain- Report Updated On Fri, Dec 4th, 2020 by Saurenergy According to Benchmark Mineral Intelligence’s study, Lithium-ion battery cell prices have decreased from $290/kWh in 2014 to $110/kWh in 2020 (large contract automotive), and there is a view in the lithium-ion industry that this trend will continue indefinitely. This in turn will lower the price of electric vehicles and bring cost parity between the internal […] Read more
The Plan is to Power the Entire Agriculture Sector With Solar: RK Singh at RE-Invest Updated On Sat, Nov 28th, 2020 by Saurenergy India’s plan is to rapidly take forward the idea of solarising its agriculture sector, and not just stop at solar pumps but cover the entire value chain. Agro-PV offers an opportunity to enable the achievement of both sustainable agriculture and clean energy transitions. Decentralised and distributed renewable energy solutions including solar-powered irrigation can significantly contribute […] Read more
BHEL Tenders for Supply of Multi-crystalline Solar PV Cells Updated On Thu, Nov 26th, 2020 by Saurenergy The Solar Business Division of BHEL has issued a tender for the supply of multi-crystalline solar PV cells The Solar Business Division (formerly Electric and Photovoltaic Division) of Bharat Heavy Electricals Limited (BHEL) has issued a tender for the supply of multi-crystalline solar photovoltaic (PV) cells (157 mm-5BB-4.62 Wp) as per BHEL technical specification. It […] Read more
The Future In Focus As Trina Solar, Tongwei In JV For Ingots, Wafers, 210 Series Updated On Thu, Nov 19th, 2020 by Saurenergy The battle for the next stage of solar growth continues to intensify, with the announcement of a Joint venture between two more Chinese majors, Trina Solar and Tongwei. Both are large, established players, with Tongwei a particularly key supplier of cells to the industry in China. The new JV hopes to fill in to critical […] Read more
New Solar Energy Plan for Bangladesh Provides Solutions for Energy Security, Rising Costs Updated On Wed, Nov 11th, 2020 by Saurenergy A shift in focus to renewables would help to reduce the need for power subsidies or tariff increases A new National Solar Energy Action Plan that has reportedly been drafted by SREDA – the Sustainable and Renewable Energy Development Authority – could be a significant and timely turnaround in Bangladesh’s renewable energy ambition. The report is coming […] Read more
2021 Carries All Solar Hopes In India, With Expected 8.8 GW Capacity Addition Updated On Tue, Nov 10th, 2020 by Saurenergy A fresh quarterly update from a research agency pegs expected solar capacity addition in the calendar year 2020 (Jan-Dec) at 2.8 GW, while Wind Energy is expected to add just 1.2 GW. However, things should start looking up from the next two quarters itself, i.e. Q4 2020 and Q1 2021, when about 4 GW of […] Read more