Aussie Firm Stirs Market with Silver-free Cell at Record 25.54% Efficiency Updated On Wed, Sep 15th, 2021 by Saurenergy Sydney-based solar technology startup SunDrive has reportedly made a breakthrough, producing a a silver-free commercial-size silicon solar PV cell with a record breaking efficiency of 25.54%. The previous record was held by LONGi for its commercial-size monocrystalline heterojunction (HJT) solar cell that achieved an efficiency of 25.26% during testing at ISFH earlier this year. The German […] Read more
LONGi, JinkoSolar, JA Solar Advocate M10 Module Standardisation Updated On Tue, Sep 14th, 2021 by Saurenergy Chinese solar PV manufacturers JA Solar, JinkoSolar, and LONGi have released a joint statement to announce they have reached a consensus on the standardisation of PV modules produced that are based on M10 wafers. The standardization scheme of modules 182mm (M10) wafers, as agreed by the three parties is as follows: The size of 54-cell modules: […] Read more
Solar Supply Chain Glitches To Drag On Climate Change Targets Updated On Tue, Sep 14th, 2021 by Saurenergy In order to meet the 1.5°C 2050 scenario under the Paris Agreement, global solar manufacturing capacity has to quadruple to 1,200-1,400 GW by 2035 to handle the peak installations needed, shows analysis by Rystad Energy. Grid parity, resilient networks and strategic partnerships have spurred growth in such capacity in recent years, to 330 gigawatts in […] Read more
Eaton, NREL, Ballard to Develop Heavy-Duty Truck Fuel Cell Technology Updated On Thu, Sep 9th, 2021 by Saurenergy Dublin-based power management company Eaton’s Vehicle Group has partnered with fuel system manufacturer Ballard Fuel Cell Systems, and the Department of Energy’s National Renewable Energy Laboratory (NREL), to develop heavy-duty truck fuel cell technology. The partnership is the result of a grant Eaton’s Vehicle Group received from the U.S. Department of Energy to develop highly […] Read more
Coal India Tenders For Partners To Build A 4 GW PV Ingot-wafer-cell-module Manufacturing Plant Updated On Tue, Sep 7th, 2021 by Saurenergy State-owned Coal India Limited has invited requests for qualification (RFQ) from prospective equity partners who wish to be shortlisted for setting up 4 GW solar PV ingot-wafer-cell-module manufacturing plant. The move is significant considering all the solar manufacturing in India is focused on cells and modules, besides mounting structures. The complete value chain, from ingots […] Read more
Goldi Solar Unveils HELOCò™ Pro Module Series with M10 Technology Updated On Tue, Aug 31st, 2021 by Saurenergy Solar PV manufacturer Goldi Solar has launched its new product line – the HELOCò Pro module series — which features mono-facial and bi-facial modules with M10 wafer size. With an area up to 2.58 square meter, weight of 32kg and power of 560W, the new modules can be widely used in utility, agriculture, industrial, and […] Read more
TPREL Commissions 150 MW Solar Project in Rajasthan Updated On Tue, Aug 24th, 2021 by Saurenergy Tata Power Renewable Energy Ltd. (TPREL), a wholly-owned subsidiary of Tata Power, has commissioned a 150 MW solar power project in Loharki, a village in Rajasthan. Spread across 756 acres of land, this plant is expected to generate more than 350 million units annually. Approximately 656,700 modules were used in the project, and the installation […] Read more
Tata Power Wins 20MW Solar plus 50MWh Battery Storage Auction of SECI Updated On Thu, Aug 12th, 2021 by Saurenergy Tata Power Solar, India’s largest solar energy company, and Tata Power’s wholly-owned subsidiary has received a “Notice of Award” (NoA) to build 50MWp Solar PV Plant with 50MWh Battery Energy Storage System (BESS) project at Phyang village in Leh, Ladakh. The order value of the project is ÌNR 386 crores. The commercial operation date for […] Read more
IPO Time For India Solar Equipment Manufacturers In 2021 Updated On Mon, Aug 9th, 2021 by Saurenergy After a long wait, initial reports are finally coming out regarding plans by major Indian solar equipment manufacturers planning Initial Public Offers. We refer to a long wait simply because the markets have been buoyant for a while now, and have duly been followed by an IPO wave the likes of which has rarely been […] Read more