Masdar, Infinity Joint Venture Powers COP 27 with Green Energy Updated On Tue, Nov 8th, 2022 by Saurenergy There couldn’t have been a better occasion and a symbol for Masdar than to offer green energy coming from renewable sources for COP-27 under UNFCCC. A joint venture between UAE’s flagship RE company and Egypt’s Infinity called – Infinity Power Holding – announced that the solar PV plant it has developed in Sharm El-Sheikh is […] Read more
Iberdrola, AXA IM Alts Partner for 1-GW Normandy Wind Auction Updated On Tue, Nov 8th, 2022 by Saurenergy Spanish multinational electric utility company Iberdrola is trying to make the most out of the French renewable expansion. In a fresh bid, Iberdrola has signed a Memorandum of Understanding (MoU) with global investment specialist AXA IM Alts for possible collaboration for upcoming projects in the offshore wind energy sector in France. Iberdrola is a participant […] Read more
Gujarat’s Renon Launches India’s First Dedicated 2W-EV Platform ‘ALPHA’ Updated On Mon, Nov 7th, 2022 by Saurenergy Gujarat-based firm Renon India, an energy storage provider company, has announced the release of its intelligent Alpha swappable battery architecture for high-performance E-two-wheelers. This Li-ion battery pack uses NMC chemistry, has a nominal voltage of 50.4 V, and a rated energy of 2.01 kWh. It can also be converted to use LFP chemistry with the […] Read more
With 165 GW Achieved, Investment of Over $300 Bn Needed to Achieve Another 335 GW by 2030 Updated On Mon, Nov 7th, 2022 by Saurenergy India needs strategic investments of more than $300 billion to achieve its clean energy capacity target of 500 GW by 2030, Arthur D. Little (ADL) has postulated a new study. Further, the study states that with 165 GW generation capacity already in place, India is on the right trajectory to meet its goal of having […] Read more
GSECL Floats Tender for 60 MW Wind Power Project in Gujarat Updated On Mon, Nov 7th, 2022 by Saurenergy Gujarat State Electricity Corporation Limited (GSECL) has floated tender to install power plants in different locations in Gujarat with a cumulative capacity of 60 MW wind power plant. For all three tenders, the last date for submitting the online bid is November 18, 2022, & the bid will be opened on the same day. This 60 […] Read more
Germany, Egypt Join Hands for Renewable Hydrogen Updated On Mon, Nov 7th, 2022 by Saurenergy Germany and Egypt have joined hands to partner for renewable hydrogen through an MoU. The agreement will also pave the way for bolstering trade in LNG. The partnership will be focused on the execution of projects for producing, processing, employing and transporting green hydrogen along with the promotion of a green hydrogen sector. Egypt and […] Read more
Sterlite Power Mulls Over Investment of Rs 50,000 Crore in RE in Karnataka Updated On Fri, Nov 4th, 2022 by Saurenergy Pratik Agarwal, Managing Director, Sterlite Power, has revealed that his company will invest Rs 50,000 crore in renewable energy in the state of Karnataka. Speaking at the Global Investors’ Meet, Pratik Agarwal held, “Over the next five years, we plan to increase the renewable capacity by 10-fold and invest close to Rs 50,000 crore into […] Read more
Set up By Adani New Enterprises, Gujarat is the Site for India’s Tallest Wind Turbine Updated On Fri, Nov 4th, 2022 by Saurenergy As part of its expansion aspirations for renewable energy, Adani New Industries Ltd has built India’s tallest wind turbine in Mundra, Gujarat that is taller than the Statue of Unity and has blades that are wider than the wingspan of a jumbo airplane. According to a corporate statement, “Adani New Industries Limited (ANIL) recently announced […] Read more
SECI Invites RFS for 1200 MW ISTS-Connected Hybrid Power Projects Updated On Fri, Nov 4th, 2022 by Saurenergy Solar Energy Corporation of India Limited (SECI) has invited a request for selection (RfS for 1200 MW) for setting up 1200 MW ISTS-connected wind-solar hybrid power projects along with an energy storage system (ESS), with the primary objective of supplying wind-solar hybrid Power to SECI. The last date for submitting the online bid is December […] Read more