The Top 5 Challenges For Green Hydrogen To Overcome Updated On Mon, Jun 3rd, 2024 by Saurenergy Hydrogen as a source of energy isn’t a new concept and is dubbed as a potential alternate energy source for over a century now. However, most hydrogen produced today is generated using fossil fuel energy, a source to about a billion tons of CO2 emissions equivalent per year. The concept of green hydrogen, promising considerable […] Read more
Green Financing A Boon For Clean Transmission Projects: Sharib Razi Updated On Fri, May 31st, 2024 by Saurenergy What are the challenges faced by the grid, when it comes to a higher share of renewable energy? Razi: There are two major challenges with increasing share of renewables in the grid. Firstly, due to the intermittent nature of renewable energy, the peak generation of solar or wind does not coincide with the peak load […] Read more
Suzlon Secures 81.9 MW Order for 3 MW Series from Oyster Green Updated On Fri, May 31st, 2024 by Saurenergy Suzlon Group has announced a new order win for the development of an 81.9 MW wind energy project for Oyster Green Hybrid One Private Limited. Suzlon will install 26 Wind Turbine Generators (WTGs) with a Hybrid Lattice Tubular (HLT) tower and a rated capacity of 3.15 MW each at the client’s site in Agar, Madhya […] Read more
India’s Peak Power Demand Smashes 2023 Peak, Touches 250 GW Updated On Fri, May 31st, 2024 by Saurenergy The Indian power sector met a record maximum power demand of 250 GW on 30th May’24 whereas, the non-solar demand touched an all-time high of 234.3 GW on 29th May This spike in power demand reflects the combined impact of weather-related loads and growing industrial and residential power consumption in these areas. On 30th May, […] Read more
Changing Dynamics: Indian Green Firms Shift Focus On Energy Storage Updated On Fri, May 31st, 2024 by Saurenergy In March 2022, India’s leading renewable energy company Adani Green Energy Limited (AGEL) collaborated with another Indian leading player in the energy storage systems–Greenko. The partnership was to seek the Hyderabad-based company’s assistance in getting Round-The-Clock (RTC) power for AGEL’s projects through Greenko’s PSP assets. PSPs are often termed as giant batteries which can storage […] Read more
Climate Risk for Renewable Energy Projects & Parametric Insurance Updated On Fri, May 31st, 2024 by Saurenergy Amidst the global conversation on climate change, the renewable energy sector finds itself at a critical juncture. As we grapple with shifting weather patterns and rising temperatures, the sector faces significant challenges in maintaining its infrastructure and ensuring operational efficiency. Research suggests a 12% reduction in wind turbine capacity by the century’s end, and a […] Read more
SECI Seeks Bids For 500 MW Wind Projects In India Updated On Thu, May 30th, 2024 by Saurenergy The Solar Energy Corporation of India( SECI), a central public sector undertaking (PSU) dedicated to the solar energy sector has released a tender for selecting wind power developers to set up 500 MW Inter-State Transmission System (ISTS-connected) wind power projects in India, under tariff-based competitive bidding (TBCB). The tender document fee/ Cost Of Document – […] Read more
China To Spend $830 Mn For Solid-State Battery R&D: Report Updated On Wed, May 29th, 2024 by Saurenergy China is planning to spend $830 million on all-solid-state battery R&D, reveals a report by Chinese Daily. Six companies, including CATL, BYD, China FAW Group, SAIC Motor Corp, Beijing WeLion New Energy Technology, and Geely Auto Group, will likely receive basic R&D support from the government, the report said. Chinese Government departments are heading this […] Read more
RWE To Build 1.6 GW Wind Farm Off German North Sea Updated On Wed, May 29th, 2024 by Saurenergy RWE has made the investment decision for its Nordseecluster, involving offshore wind projects with a total capacity of 1.6 gigawatts (GW). The wind farms will be built in the North Sea, about 50 kilometres north of the island of Juist. Suppliers of the main components have already been selected for the cluster as a whole. […] Read more