US-India Launch $1 Bn Initiative To Build Clean Supply Chains Updated On Mon, Sep 23rd, 2024 by Saurenergy The United States (US) and India elevate and expand bilateral technical, financial, and policy support to enhance the complementary manufacturing capacity of clean energy technologies and components. This policy also lays the groundwork for enhanced cooperation and partnerships in Africa. The Strategic Clean Energy Partnership, led by the US Department of Energy and Indian government […] Read more
Hybrid Inverters Allowed Under PM Surya Ghar Scheme: MNRE Updated On Mon, Sep 23rd, 2024 by Saurenergy The Ministry of New and Renewable Energy (MNRE) recently released a document clarifying operational guidelines on the implementation of the PM Surya Ghar: Muft Bijli Yojana. The new clause widened the technologies included under the CFA offered to residential consumers. The new clause as per the latest document issued by the MNRE included additional technologies […] Read more
ICRA Sees FDRE, RTC Projects As Key Drivers Of India’s RE Growth Updated On Mon, Sep 23rd, 2024 by Saurenergy A recent report by the Investment Information and Credit Rating Agency (ICRA) foresees a rise in renewable energy capacity in the next six years in India. It is estimated that the share of renewable energy (RE), plus large hydro, in all-India electricity generation, will increase to over 35% in FY2030 from 21% in FY2024. ICRA […] Read more
CEA Approves 2.5 GW Of PSP Projects In Maharashtra Updated On Mon, Sep 23rd, 2024 by Saurenergy The Central Electricity Authority (CEA) has announced concurring two more Pumped Storage Projects (PSPs) in Maharashtra namely-1500 MW Bhavali PSP being developed by JSW Energy Ltd. and 1000 MW Bhivpuri PSP being developed by Tata Power Co. Ltd. These PSPs are concurred with the support of the Central Water Commission (CWC), Geological Survey of India […] Read more
LONGi Revenues Down 40% In H1 2024, Losses Climb To $760 Million Updated On Thu, Sep 19th, 2024 by Saurenergy LONGi Green Energy, one of the largest integrated solar manufacturers , has reported its H1 results. The results reflect the weakness in prices seen during the year, with the firm slipping into significant loses on a reduced turnover. All this, despite LONGi reporting shipment of over 78 GW of wafer, cells and modules. LONGi reported […] Read more
NTPC Green Energy plans $1.2 billion IPO Updated On Thu, Sep 19th, 2024 by Saurenergy State-owned NTPC’s green arm, NTPC Green Energy, has filed draft papers for an initial public offering (IPO) to raise about $1.2 billion (about ₹10,000 crore). NTPC Green Energy, floated in 2021, was set up with the express purpose of a dedicated approach to green energy capacity creation for NTPC, which has a target of 60 […] Read more
Tata Power Renewable Energy Secures 400 MW Hybrid Project from MSEDCL Updated On Wed, Sep 18th, 2024 by Saurenergy Tata Power Renewable Energy Limited (TPREL), the green arm of the Tata Power Company Limited, has successfully secured a Letter of Award (LoA) from the Maharashtra State Electricity Distribution Company Limited (MSEDCL), a wholly owned entity under the Maharashtra Government, for the development of a 400 MW Wind-Solar Hybrid project in Maharashtra. The LoA includes […] Read more
Torrent Power Wins 1,500 MW/12,000 Energy Storage Bid From MSEDCL Updated On Wed, Sep 18th, 2024 by Saurenergy Torrent Power Limited recently secured a 1,500 MW pumped hydro storage project from the Maharashtra State Electricity Distribution Co. Limited (MSEDCL). Under this mutually agreement provisions, Torrent Power will procure 1,500 MW/12,000 MWh of energy storage capacity from the pumped hydro storage (PSP) project. MSEDCL will provide a detailed Letter of Award (LOI) after obtaining […] Read more
IGREL, Inox Wind Set To Build 550 MW Wind Project Across Three States Updated On Wed, Sep 18th, 2024 by Saurenergy Inox Wind Limited (IWL) announced receiving a Letter of Intent (LoI) from IGREL Renewables Ltd (IGREL) to execute 550 MW of wind capacity on a turnkey basis. The project will be executed over the next 24 months across multiple sites in Gujarat, Rajasthan, and Madhya Pradesh. The 550 MW LoI exceeds the firm order of […] Read more