Unravelling The Mess At Gensol-Speed Essential Updated On Thu, Apr 24th, 2025 by Saurenergy A report in business daily Mint has finally raised the issue of embattled solar EPC firm Gensol’s recent tender wins, and the likely future of those projects. The report cites sources close to the matter at the government as saying that all options, including rebidding are on the table. At SaurEnergy, we have also been […] Read more
GUVNL Awards 250 MW Wind Project to KPI, Juniper, Jakson Green & Inox Updated On Thu, Apr 24th, 2025 by Saurenergy Gujarat Urja Vikas Nigam Ltd (GUVNL) has awarded its 250 MW (Phase IX) grid-connected wind power project to KPI Green Energy, Juniper Green Energy, JGRJ Four Renewable (Jakson Green), and Inox Neo Energies (Inox Clean Energy). The tender includes a greenshoe option for an additional 250 MW in Gujarat. KPI Green Energy won the largest […] Read more
Green Stocks April 23: Waaree Energies All The Way Updated On Wed, Apr 23rd, 2025 by Saurenergy We have been stressing how it will be news that drives stocks for now, and Waaree Energies served up the best possible illustration of this thesis. In delivering the set of Q4 numbers and full year numbers for FY 25, the firm provided great validation of its prospects, leading to a massive surge today. That […] Read more
With Hit On 810 MW Offshore Project, RE Hopes In US Get Rude Shock Updated On Wed, Apr 23rd, 2025 by Saurenergy While there was little doubt about the antipathy of the incoming Trump administration to renewable energy, built around unsubstantiated allegations without basis in science or data, it has taken a proper brake on a key project to wake up renewable energy sector to the risks they face now. The project in question is an 810 […] Read more
Suzlon Wins 378 MW Order From NGEL, Pact Grows To 1.544 GW Updated On Wed, Apr 23rd, 2025 by Saurenergy Suzlon Group has secured a 378 MW wind project order from NTPC Green Energy Ltd (NGEL), expanding its total partnership capacity with the public sector utility to 1,544 MW. The win comes even as a key Industry body has predicted additions of 6-7 GW in wind capacity in Fy 26 for India. This marks Suzlon’s […] Read more
Senior Supply Planner Updated On Tue, Apr 22nd, 2025 by Saurenergy The Senior Supply Planner will be based in Hyderabad. In this position, you will report to the Director, APAC Planning. The Senior Supply Planner brings tactical expertise & strategic thinking to support a world-class demand-driven supply chain. In this role, you will be responsible for all aspects of supply planning for our solar tracker components […] Read more
DVC Invites Bids For 250 MW/500MWh BESS Project In Jharkhand Updated On Tue, Apr 22nd, 2025 by Saurenergy Damodar Valley Corporation (DVC) has issued a tender for the development of a 250 MW / 500 MWh Battery Energy Storage System (BESS) project at Maithon in Jharkhand. The selected battery energy storage system developer (BESSD) will be responsible for engineering, procurement, and construction (EPC) activities, as well as the operation and maintenance of the […] Read more
INR 4.79 Lac Crore Headed For Energy Storage In India By 2032 Updated On Mon, Apr 21st, 2025 by Saurenergy Leading industry body IESA (India Energy Storage Alliance) has projected that India’s energy storage sector is poised to expand fivefold between 2026 and 2032. At the 5th Edition of Gujarat’s Stationary Energy Storage India (SESI) 2025, industry leaders expect INR 479 thousand crore investment in energy storage by 2032 to further boost this growth and […] Read more
Adani Ends Up With 8534 MW From Mfg. Linked Tender, Azure Left With 1667 MW Updated On Mon, Apr 21st, 2025 by Saurenergy In a petition before the Central Electricity Regulatory Commission (CERC) where the commission finally stayed away from any comment or order, SECI has allocated 8534 MW out of the total 12000 MW to Adani Green, while Azure Power, which had won 4000 MW in comparison to Adani’s 8000 MW in the same tender, has been […] Read more