India’s EV Sector Attracts Rs. 25,000 Crore Investments Till July 2021 Updated On Mon, Aug 2nd, 2021 by Saurenergy Indian EV sector recorded Investments of approx. Rs. 25,000 crore during the first seven months of this year. The second wave of Covid-19 was highly destructive to almost every sector of the country. However, the electric vehicle (EV) and e-mobility sector says a different story, as it has witnessed numerous financial deals and investments. India’s e-mobility […] Read more
Andhra Pradesh to Switch Auto-rickshaws into Electric under ‘Go Electric’ Campaign Updated On Mon, Aug 2nd, 2021 by Saurenergy The New and Renewable Energy Development Corporation of Andhra Pradesh (NREDCAP) has launched a pilot project to convert the holy city, Tirupati into a Zero-emission city. Under the pilot project, NREDCAP will ramp up the electric vehicle (EV) adoption in the city by introducing more EVs and charging infrastructure. The project involves introducing three electric […] Read more
Hindustan Zinc To Use BEVs in Underground Mining, Partners with Normet Group Updated On Fri, Jul 30th, 2021 by Saurenergy Indian mining major, Hindustan Zinc Ltd. (HZL), today announced its big plan for decarbonization of its mines. HZL has partnered with Normet Group that works for making underground mining and tunnelings digitalized and sustainable, to introduce India’s first battery electric vehicles (BEVs) in underground (UG) mines. HZL’s CEO MR, Arun Misra has announced an investment […] Read more
BTM Storage is Closer Than You Think In India, Says Report Updated On Fri, Jul 30th, 2021 by Saurenergy Integrating large amounts of behind-the-meter (BtM) battery storage and consuming their own energy will be possible for non-residential consumers by 2025, enabling a distributed energy future, says a new report Auroville Consulting. The report findings are based on the levelized cost analysis of solar-plus-energy storage systems for consumers in Tamil Nadu. The status report titled […] Read more
Executive (Clean Technologies)-01 Post for 01 year Updated On Fri, Jul 30th, 2021 by Saurenergy NTPC is looking for experienced professionals for Clean Technologies area for specific period as per details given below: Qualification: Degree in Engineering/Technology in any discipline with at least 60% marks from a recognized university/institution. Candidates with M. Tech/Ph.D in the energy domain will be preferred. Experience Requirement: Min. 5 years of post-qualification executive experience in […] Read more
80% of EV Owners Not Put Off by Charging Hassles, Finds Survey Updated On Fri, Jul 30th, 2021 by Saurenergy A recent survey conducted by Climate Trends and YouGov has found that while 80% of end users of electric vehicles do not find charging a hassle, for the remaining 20%, charging and infrastructure as the biggest barriers for adoption. Eye wateringly high fuel costs and better awareness of the pollution caused by them is probably […] Read more
$150 Billion Green Deals in India by 2030 Updated On Thu, Jul 29th, 2021 by Saurenergy International investors expect $150 billion green deals in the Indian Renewables Energy sector by 2030. The money would be a function of both capacity additions in the market as well as trading between players. India’s renewables growth has been in the eyes of international investors and bankers and they are seeking green deals in the […] Read more
With India’s Renewable Power Capacity Battle Won, Is It Time To Focus On Generation? Updated On Wed, Jul 28th, 2021 by Saurenergy In response to a query in the ongoing monsoon session of parliament, Power and MNRE Minister R.K. Singh informed the house that India’s renewable energy capacity, including installed, under installation and being tied up, stands at almost 97 GW as of June 30, 2021. This mix includes solar, wind, biomass and small hydel. Add to […] Read more
Lohum Plans Integrated Li-Ion Unit f 3 GWh/3000 MWh At Gr. Noida Facility Updated On Wed, Jul 28th, 2021 by Saurenergy LOHUM, positioned as the world’s leading integrated lithium-ion battery player, has announced that it will set-up 3GWh capacity single-location integrated Li-ion battery manufacturing and recycling factory in Greater Noida, Uttar Pradesh within the next 18 months. The integrated factory will have the battery manufacturing capacity of 1 GWh/ 1,000 MWh and 2GWh/ 2,000 MWh of […] Read more