Simulation Specialist – Solar Manufacturing Updated On Thu, Sep 12th, 2024 by Saurenergy Responsibilities:- Simulate and analyze fluid dynamics and heat transfer phenomena using COMSOL Multiphysics Design and optimize systems and processes for improved fluid flow and heat/mass transfer performance Characterize and model material properties and their impact on fluid flow and heat transfer Interpret and present simulation results to internal stakeholders Collaborate with cross functional teams to […] Read more
Ireland Hopes for 1334 MW Of RE Additions After Round 4 of Capacity Auctions Updated On Thu, Sep 12th, 2024 by Saurenergy Provisional results from the fourth round of the Irish Renewable Energy Support Scheme (RESS 4) confirm 1,334 MW of renewable energy bids that meet criteria. Of this, 960MW is solar PV and 374MW onshore wind. The average auction price has come in at €96.85 (£81.73) per MWh, with the generation-weighted average price for solar projects […] Read more
APTEL Refuses To Provide Relief To ReNew In 300 MW Wind Project Updated On Wed, Sep 11th, 2024 by Saurenergy The Appellate Tribunal for Electricity, in an order dated September 10, has ruled on a case involving ReNew (through ReNew Naveen Urja Private Limited) and SECI , and by extension, CERC. Case Overview: Renew Naveen Urja Private Limited (Appellant) vs. Central Electricity Regulatory Commission (CERC) & Solar Energy Corporation of India Limited (SECI). ReNew sought […] Read more
NVVN Seeks Bids to Set Up 250 MW/500 MWh Standalone BESS Updated On Tue, Sep 10th, 2024 by Saurenergy NTPC subsidiary, Vidyut Vyapar Nigam Limited (NVVN), recently released a tender for setting up 250 MW/500 MWh standalone battery energy storage systems with viability gap funding support. NTPC released this tender under a tariff-based global competitive bidding request. The last date for bid submission is 17th September 2024. As per the NTPC Vidyut Vyapar Nigam […] Read more
For Net Zero India Needs 494 GWs Of Solar & Wind Capacity By 2030: Bloomberg NEF Updated On Thu, Sep 5th, 2024 by Saurenergy The New Energy Outlook report released by Bloomberg NEF at its Indian event says India needs more than 4 terawatts of wind and solar capacity installation by 2050 for the Net Zero Scenario. Power demand is projected to grow six fold during the period. Moreover, the report also calls for over $12 trillion investment and […] Read more
415 GW and Beyond: Role of Solar Energy in Meeting Global 2030 Climate Goals Updated On Thu, Sep 5th, 2024 by Saurenergy The urgency for a global shift towards sustainable development, primarily driven by renewable energy, is undeniable. Both developed and developing economies have embraced the need to limit the increase in global temperatures, as agreed in the Paris Agreement (COP21). This agreement set ambitious goals for nations to work towards keeping the global temperature increase to […] Read more
Ministry Of Finance Grants Navratna Status To SECI, NHPC And SJVN Updated On Mon, Sep 2nd, 2024 by Saurenergy In a significant indicator of their growing stature and performance, the Ministry of Finance recently conferred ‘Navratna’ status to three Central Public Sector Enterprises (CPSE) namely, Solar Energy Corporation of India (SECI), National Hydroelectric Power Corporation (NHPC), and SJVN to develop and expand Renewable Energy (RE) capacity in India under the Ministry of New and […] Read more
Solar Generation In India Improved In FY24: Fitch Ratings Updated On Mon, Sep 2nd, 2024 by Saurenergy In the financial year ending March 2024 (FY24), India saw improved power generation performance. However, overall power generation was slightly below the one-year P90 forecasts, Fitch Ratings reports. Fitch Ratings, a credit rating organization headquartered in both New York and London, observed an increase in generation at the portfolio level. The company reported a 4% […] Read more
Lead – Quality (SQA) – Solar Manufacturing Updated On Mon, Sep 2nd, 2024 by Saurenergy Responsibilities:- The key Roles and Responsibilities of team lead are to manage the working teams and… Supplier evaluations as per audit plans lead given by Techno commercial team. Ensure joint inspection at suppliers during initial development of raw material. Supplier onsite pre dispatch inspection for confirming incoming materials as per approved specifications standards. Ensure MDCC […] Read more