NHPC Opens Bids For 1.2 GW Wind-Solar Hybrid Tender Updated On Thu, Dec 26th, 2024 by Saurenergy NHPC recently issued a tender to select developers for a 1.2 GW wind-solar hybrid project, with or without energy storage systems. The project includes a greenshoe option, and bids are invited until January 16, 2025. The bidders may use technology-agnostic resources such as crystalline silicon, thin film, or CPV technologies, with or without trackers, for […] Read more
NTPC Issues Tender To Build Solar Trees For Its Bongaigaon Project Updated On Thu, Dec 26th, 2024 by Saurenergy NTPC recently issued a tender to build and commission solar trees for the NTPC’s Bongaigaon project located in Assam. It invited the bids till December 30, 2024. The NTPC project will be located at the Bongaigaon Thermal Power Project, managed by NTPC’s Central Procurement Group – 2, Sipat Super Thermal Power Station in Chhattisgarh. The […] Read more
News Briefs- Sungrow’s PowerTitan 2.0 In Greece, Longroad-META Deal, Repowering Wind In Germany Updated On Thu, Dec 26th, 2024 by Saurenergy Sungrow’s PowerTitan to Power 105MWh Storage Projects In Greece Sungrow, the world’s leading provider of photovoltaic inverters and energy storage systems, has entered a strategic partnership with KTISTOR Energy for the implementation of its PowerTitan 2.0 liquid-cooled battery energy storage system (BESS) in several key projects in Greece. Four key energy storage projects in northern […] Read more
Solar Energy Trends in 2025-The View From Europe Updated On Tue, Dec 24th, 2024 by Saurenergy A tsunami of cheap Chinese solar panels flooding Europe, an increasing taste for rooftop solar and a boom for small, medium and large-scale battery storage. These are the three strongest trends in solar energy as we move into the new year. I have predicted global solar and renewable trends for the past ten years. Most […] Read more
Electricity Costs: India’s Lowest and Most Expensive States, The Global Picture Updated On Fri, Dec 20th, 2024 by Saurenergy A lot of factors influence the per unit electricity costs in a country. The prices are heavily influenced by factors that include the country’s geographical location, geological makeup, level of development and technological advancement, and whether it is a high-, middle-, or low-income nation. The rise of renewable power through the recent decades has also […] Read more
Assistant Manager CAD (CIVIL -SOLAR PROJECTS ONLY)) Updated On Thu, Dec 19th, 2024 by Saurenergy Responsibilities:- India and Overseas site visits during various phases of the project (pre-bid, construction, Operation and Maintenance) and prepare site visit report, site feasibility assessment and remedial measures for Solar PV plant as per requirement. Review preliminary investigation reports, Geo-technical, topography, hydrology and prepare executive summary from the reports and shall propose best suitable solution […] Read more
ACME Solar Commissions 1 GW Solar Projects In Rajasthan Updated On Thu, Dec 19th, 2024 by Saurenergy Haryana-based ACME Solar Holdings Limited (ASHL), has now commissioned its four ISTS-connected SECI projects. These solar projects aggregated to 1.02 GW are located in Jaisalmer, Rajasthan. They are part of a 1200 MW cluster spread over 4 projects. This achievement marks the commissioning of one of the largest single-location projects in India. The remaining capacity […] Read more
Refex, LC Infra Collaborate For 150 MW MAHAGENCO Solar Project Updated On Wed, Dec 18th, 2024 by Saurenergy Tamil Nadu-based Refex Renewables & Infrastructure Limited recently incorporated LC Infra Solar LLP as its new step-down subsidiary. The new entity is designed to build a 150 MW solar power project. Maharashtra State Power Generation Co. Ltd. (MAHAGENCO) awarded this project to Refex. To develop this project, the company established the subsidiary through an initiative […] Read more
NHPC Floats 1.2 GW Wind-Solar Hybrid Tender With Greenshoe Option Updated On Wed, Dec 18th, 2024 by Saurenergy In a bid to procure hybrid power, NHPC recently floated a tender to supply 1,200 MW of power from wind-solar hybrid power projects, with a greenshoe option, The tender also said these projects could be established with or without Energy Storage Systems (ESS) anywhere in India. NHPC set 16th January 2025 as the last date […] Read more