NHPC Floats 1.2 GW Wind-Solar Hybrid Tender With Greenshoe Option Updated On Wed, Dec 18th, 2024 by Saurenergy In a bid to procure hybrid power, NHPC recently floated a tender to supply 1,200 MW of power from wind-solar hybrid power projects, with a greenshoe option, The tender also said these projects could be established with or without Energy Storage Systems (ESS) anywhere in India. NHPC set 16th January 2025 as the last date […] Read more
Solar Power Europe Terms 2024 A ‘Warning’ As Solar Growth Slumps To 4% Updated On Wed, Dec 18th, 2024 by Saurenergy After years of stellar growth, the EU solar sector has been hit by a significant deployment slowdown – tumbling from 53% growth in 2023 to 4% in 2024, amounting to a 92% slowdown in solar growth over the last year. With 65.5 GW of new solar in 2024, the sector just inched past its 2023 […] Read more
Inox Wind Wins 60 MW Order From Serentica For Karnataka Project Updated On Wed, Dec 18th, 2024 by Saurenergy Inox Wind Limited (IWL), a wind energy solutions provider, today announced bagging a 60 MW order from Serentica Renewables (Serentica), a commercial and Industrial (C&I) focused renewable energy company in India. This order is to supply 3 MW class turbines and will be delivered within H1 CY25. Additionally, IWL will provide multi-year post-commissioning Operations and […] Read more
Green Stocks Dec 17: Borosil Renewables, Waaree RTL Stand Out Updated On Tue, Dec 17th, 2024 by Saurenergy With the broader market slumping yet again, unable to sustain over 24500 levels, some of our green stocks found their mojo yet again to rise sharply. Borosil Renewables stood out with an over 4% jump to cross the Rs 600 mark yet again, while Waaree RTL, the EPC arm of the Waaree group, seemed to […] Read more
Railways Setup 3.7 MW Of Solar Plants Along Track, Says MNRE Updated On Tue, Dec 17th, 2024 by Saurenergy Indian Railways has set up 3.7 MW of solar power plants along railway tracks till now, data from MNRE revealed. Minister of State (MoS) for New and Renewable Energy Shripad Yesso Naik in his latest statement before Lok Sabha shed light on the solarisation of Indian railways. This comes at a time when the Indian […] Read more
Assistant Manager- Mechanical (Wind) Updated On Mon, Dec 16th, 2024 by Saurenergy Responsible of Overall erection and commissioning of Wind turbine in timely manner with required standard of Safety and quality at site. Erection and commissioning of Wind Turbine Logistic management and operation Crane and other resources Management Site coordination and management Quality and Safety at site Procurement Management Contractor Management Stakeholder Management Monitoring and controlling Responsibilities:- […] Read more
Chief Manager- Electrical (Wind) Updated On Mon, Dec 16th, 2024 by Saurenergy Responsible of Overall Electrical BOP activities of Wind project in timely manner with required standard of Safety and quality at site. Project planning and Execution Site coordination and management Resource management Installation and Commissioning Quality and Safety at site Procurement Management Contractor Management Stakeholder Management Monitoring and controlling Logistic Operation Position Demands:- Travel As and when […] Read more
Meghalaya Govt Unveils Policy To Boost Solar, Wind Energy Capacity Updated On Mon, Dec 16th, 2024 by Saurenergy The Meghalaya government recently released its policy to execute and expand solar power generation in the state, aiming to increase its solar power capacity from the current 4.28 MW (Till Nov. 2024). The latest policy released by the state allows short-term power purchases on behalf of the State Distribution Utility, entering into Power Purchase Agreements […] Read more
Indus Towers, JSW Arm Invest Rs. 38.03 Cr For 130 MW Solar Project Updated On Fri, Dec 13th, 2024 by Saurenergy Indus Tower, a Haryana-based telecom tower company today entered into a power purchase agreement (PPA) with JSW Green Energy Eight Limited, a special purpose vehicle (SPV). Under this agreement, Indus Tower would receive 130 MW of renewable energy from a solar power plant under captive mode. The company also agreed to make approximately Rs 38.03 […] Read more