Manager Renewable Engineering (Control & Instrumentation Engineer) Updated On Tue, Sep 17th, 2024 by Saurenergy We are seeking a leading role in the Renewable Engineering Control & Instrumentation (C&I) division for our Renewable Energy (RE) Power Plants which will be a mix of Solar, Wind, and BESS systems. This position is responsible for C&I engineering which includes major development of control architecture of complete solar + wind + BESS Hybrid […] Read more
SJVN Invites Bids For 600 MW/2,400 MWh ESS Across India Updated On Mon, Sep 16th, 2024 by Saurenergy SJVN, in coordination with the Renewable Energy Implementation Agency (REIA), has released a 1.2 GW tender for solar plus energy storage. The tender invites bids from Solar Power Developers (SPDs) to set up ISTS-connected Solar PV Power Projects with 600 MW/2,400 MWh Energy Storage Systems (ESS) anywhere in India under Tariff-Based Competitive Bidding on a […] Read more
A&N: SECI Floats Tender For 30 MW Project Under RESCO Mode Updated On Mon, Sep 16th, 2024 by Saurenergy In an effort to provide solar power to the Union Territory (UT) of Andaman and Nicobar Islands (EDA&N), the Electricity Department and SECI have issued a tender. SECI requested bids from solar power developers to establish 30 MW grid-connected rooftop solar PV projects in the Union Territory. This project will be executed under the RESCO […] Read more
Global RTS Achieves 15% Growth In 10Yrs, Hits 105 GW: CEEW Updated On Thu, Sep 12th, 2024 by Saurenergy The global transition to solar photovoltaic (PV) technologies, particularly distributed solar or rooftop solar (RTS), is playing a pivotal role in helping economies like India, China, the US, Japan, and Australia meet their net-zero targets. A recent study by CEEW, “Global Perspectives on Rooftop Solar Energy A Deep Dive on How Leading Economies Advance Rooftop […] Read more
Ireland Hopes for 1334 MW Of RE Additions After Round 4 of Capacity Auctions Updated On Thu, Sep 12th, 2024 by Saurenergy Provisional results from the fourth round of the Irish Renewable Energy Support Scheme (RESS 4) confirm 1,334 MW of renewable energy bids that meet criteria. Of this, 960MW is solar PV and 374MW onshore wind. The average auction price has come in at €96.85 (£81.73) per MWh, with the generation-weighted average price for solar projects […] Read more
The Rise Of BESS: The ‘Age of Batteries’ Draws Closer Updated On Fri, Sep 6th, 2024 by Saurenergy BESS (Battery Energy Storage System) technology has emerged as a key product for transforming as well as storing, distributing the excess green electricity for later use and for reducing the emissions of CO2. According to the International Energy Agency (IEA), World Energy Outlook 2024 Report, in 2023 battery storage in the power sector was the […] Read more
UK Announces 9.6 GW of Renewable Awards In Sixth CfD Auction Updated On Thu, Sep 5th, 2024 by Saurenergy The much awaited renewable awards with contract for difference have been announced finally. The results were awaited eagerly following the abject failure of the last offer, and was considered particularly vital for the offshore wind industry after a string of bad news, including cancellation of awarded projects elsewhere in Europe. With £1.56 billion allocated to […] Read more
L&T Carves Out Renewable Energy Vertical In Its Infrastructure Segment Updated On Mon, Sep 2nd, 2024 by Saurenergy Effective from 1st September 2024, Larsen & Toubro (L&T) carved out a separate business vertical for renewable EPC out of its Power Transmission and Distribution (PT&D) business, within its Infrastructure Projects segment. L&T has created the Renewable EPC business, as an addition to its construction verticals. The move comes at a time when the division […] Read more
Project and Commissioning Engineer Updated On Wed, Aug 28th, 2024 by Saurenergy As a Project and Commissioning Engineer, you will drive project management and engineering actions, ensuring timely completion. Additionally, manage customer relationships throughout the project lifecycle, while maintaining seamless communication channels with internal and external stakeholders. Key responsibilities:- Conduct onsite installation and configuration of SCADA/ SCADA HMI systems and monitoring devices, including rigorous testing, seamless start-up, […] Read more