MNRE Postpones Commissioning of 7,750 MW Grid-Connected VGF Solar Projects Updated On Sat, Sep 1st, 2018 by Saurenergy MNRE does not hold the developers responsible for the delay in the commissioning of solar PV projects but the supervisory authorities. Ministry of New and Renewable Energy (MNRE) has in a row extended the commissioning deadlines of 7,750 MW grid-connected solar PV power projects under different batches of viability gap funding (VGF) planned under 2nd […] Read more
HPL Solar Cables Updated On Mon, Aug 27th, 2018 by Saurenergy INTRODUCTION SOLAR CABLE is nervous systems of a Solar power plant from panels to invertor and, therefore, one of the most crucial parts. They are connected on DC side of the system, proper cable sizing and its quality ultimately decides the power delivered to the load and in turn efficiency of the entire system because […] Read more
MSEDCL, MEDA Disagree over Solar Power Development Updated On Mon, Aug 27th, 2018 by Saurenergy MSEDCL’s sister concern Maharashtra Energy Development Agency (MEDA) has been in comprehensive support to the solar developments with deciding to provide a subsidy on solar power from 2018-19. Maharashtra’s state-run electricity distribution company MSEDCL has been reluctant in supporting the development of solar power in the state by proposing a surcharge to be levied on […] Read more
Viz-A-Viz with Saurabh Bhandari, Founder & CEO, SolarMaxx Updated On Mon, Aug 27th, 2018 by Saurenergy Q. To begin with can you give our readers a brief overview of SolarMaxx including the vision behind its formation and its current role in the market? SolarMaxx, established in 2008, is a leading manufacturer and supplier of high efficiency Solar PV Modules suitable for utility scale power plants as well as rooftop solar. SolarMaxx […] Read more
HPL’s Solar Array Junction Box (AJB) Updated On Sat, Aug 25th, 2018 by Saurenergy Array Junction Boxes (AJB), also referred to as PV combiner boxes, it collects DC power from PV strings with blocking diodes on each string for protecting panels from reverse current flow. The collected power is then transferred to inverter to be converted into AC. AJB is meant for combining all the incoming lines from the […] Read more
India’s Veltoor Solar Project Gets World’s First Solar Plant Project Certificate Updated On Fri, Aug 24th, 2018 by Saurenergy The certificate to Veltoor solar project confirms all relevant safety features of the solar park and demonstrates the technical compliance of the project with the globally recognized standards. Adding another milestone to India’s solar power generation aspiration, Norwegian testing and risk management company DNV GL has issued world’s first solar power plant certificate to the […] Read more
NISE Opens Registration for 2nd Batch ‘Advance Solar Professionals Course’ Updated On Fri, Aug 24th, 2018 by Saurenergy Advance Solar Professional course is aimed at aims in a better understanding and hands-on-practice in the different streams of solar energy including Solar Photovoltaic technologies, Applications in the form of On-grid and Off-grid systems, Solar Water Pumping System, Solar Thermal technologies. Keeping in view the scope of solar energy in the country and […] Read more
HPL’s AC DISTRIBUTION BOX (ACDB) for Solar Application Updated On Thu, Aug 23rd, 2018 by Saurenergy The ACDB receives AC power from solar inverter and directs it to AC loads / LT Panel. ACDB is an important part of SPV system as it provides extra protection to the system in case of failures on load side A provision can also be made in ACDB to monitor the consumption of power from […] Read more
REC Group Makes Comeback in India with RESCO’s 45MW Solar Order Updated On Thu, Aug 23rd, 2018 by Saurenergy Order winner, REC Group has planned to showcase its breakthrough technologies in the upcoming Renewable Energy India Expo (REI Expo). European solar photovoltaic (PV) panel provider in India, REC Group has clocked major orders in the rooftop RESCO segment in the month of June and July. The total orders combined for the three-leading solar EPC […] Read more