SUBSCRIBE NEWS LETTER

solar PV

GGGI to Build 250 MW Solar Plant Along Mumbai-Nagpur Superhighway

With its rapid economic growth and increasing demand for energy services, India is well-placed to invest more in clean, cheap reliable sources of energy, particularly in the solar sector. However, this potential remains largely untapped. The Indian government has set a goal of 100 gigawatts (GW) of solar power capacity by 2022, but it had […]

Read more

Scientists in Germany Develop Cost-effective Solar Cell Deposition Method

Researchers led by the Technical University of Ilmenau in Germany claim that if silicon dioxide (SiO2) films are deposited at room temperature without complex vacuum systems, they can be a good, cost-effective candidate for use in commercial c-Si solar cell production lines. SiO2 deposition is used as a passivation layer or a protective layer in various types […]

Read more

LONGi Bags Top Performer & Achiever Awards at PVEL and RETC

China-based major in solar cells and modules, LONGi Solar has bagged awards and recognition for PV module reliability and performance from two different testing labs— PVEL and RETC. LONGi received the ‘2021 Top Performer’ rank by PV Evolution Labs (PVEL), a leading independent test lab for the downstream solar industry. The company has won this […]

Read more

Solex & Jinchen Sign MoU for 1.2 GW PV module production line in Surat

Gujarat-headquartered solar PV manufacturer Solex Energy Limited has signed a Memorandum of Understanding (MoU) for acquiring 1.2 GW of solar module production equipment from China’s Jinchen Machinery, as it plans to expand output. The first phase of 600 MW will be commissioned by October-2021 and the work for the second phase of 600 MW will start immediately as […]

Read more

Solar MGR – Civil

Dimensions parts or elements for a technical solution as to the requirements and related to a specific technical field. Checks the possibilities for technical realization regarding the requirements. Drafts the technical realization of the requirements within the technical discipline. Dimensions elements, components or software by calculation or by their specification according to the requirements and, […]

Read more

SECI Posts Another Bid Deadline Extension for Solar Tender in Tamil Nadu

New Delhi-headquartered Solar Energy Corporation of India Limited (SECI) has extended the bid submission deadline for its tender for the design, engineering, supply, construction, erection, testing and commissioning of 50 MW (AC) solar PV project with land having 10 years plant O&M at Tamil Nadu. The last date for bid submission has been extended from June […]

Read more

IREDA Extends Bid Date For 12 GW CPSU Solar Scheme

Indian Renewable Energy Development Agency Ltd. (IREDA), the implementing agency appointed by  Ministry of New & Renewable Energy (MNRE) for the CPSU Scheme Phase II  has extended the bid submission date to 15th June. The Central Public Sector Undertaking (CPSU) scheme phase-II envisages setting up 12,000 MW grid-connected solar projects with viability gap funding (VGF). […]

Read more

Cell Shortage Forces Timeline Extension by MNRE For CPSU Phase II Solar

As predicted by many Industry experts, domestic cell production has failed to keep up with demand for various central schemes that mandate local sourcing. Now the Ministry of New And Renewable Energy (MNRE) has stepped in to provide and extension to projects under tranche I and II of the CPSU Phase II scheme. The MNRE […]

Read more

Hong Kong’s CyberPort Gets An Innovative Solar Rooftop From NEFIN

Solar photovoltaic (PV) developer and investor in carbon neutrality solutions, NEFIN Group, has announced the start of its solar system installation at Hong Kong’s Cyberport Business Centre, a key fintech hub in the city state. Nefin was appointed by Hong Kong Cyberport (Cyberport). Nefin claims that its system overcomes space and loading constraints of most buildings […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll