GUVNL Invites RFS for 500 MW Solar Projects with Greenshoe Option Updated On Fri, Oct 28th, 2022 by Saurenergy Gujarat Urja Vikas Nigam (GUVNL) has floated a request for selection to purchase power through a competitive bidding process from 500 MW grid-connected solar PV power projects to be set up anywhere in India. There is a greenshoe option with an additional capacity of 500 MW (RFS for 500 MW). The last date for submitting […] Read more
First Solar Secures Second GW Scale Solar Module Order from Swift Current Energy Updated On Thu, Oct 27th, 2022 by Saurenergy Leading global provider of PV solar solutions First Solar has revealed that it has entered into an agreement with Swift Current Energy. The agreement will pave the way for First Solar to supply Swift Current Energy with 2 gigawatts (GW)DC of high-performance, thin film solar modules in 2025 and 2026. Swift Current Energy, headquartered in Boston, […] Read more
Borosil Renewables Closes Acquisition Of Solar Glass Maker Interfloat Updated On Wed, Oct 26th, 2022 by Saurenergy Mumbai-based solar glass manufacturer Borosil Renewables Ltd (BRL) and EU-based Interfloat Group announced the Borosil Renewables’ acquisition of 86% stake in the Interfloat Group, through its overseas wholly-owned subsidiaries. GMB operates a solar glass plant with a production capacity of 300 TPD (Tonnes per Day). With its acquisition of the Interfloat Group, BRL’s solar glass […] Read more
Daqo Subsidiaries Sign Polysilicon Supply Agreement with Solar Manufacturer Updated On Wed, Oct 26th, 2022 by Saurenergy In a key announcement, Daqo New Energy Corporation, a leading Chinese manufacturer of high-purity polysilicon for the global solar PV industry, has held that its subsidiaries Xinjiang Daqo and Inner Mongolia Daqo have signed a six-year high-purity polysilicon supply agreement with a leading solar manufacturing company in China. The name of the solar manufacturer is […] Read more
Resurgence of Heterojunction (HJT) Solar Panels Updated On Tue, Oct 25th, 2022 by Saurenergy After being overlooked initially for many years, there has been a resurgence of interest in Heterojunction technology (HJT) in the last couple of years. From Reliance to Goldi Solar, many private players in India have shown a growing interest in HJT solar technology. It is intriguing that the Indian market is witnessing an escalating interest […] Read more
First Solar will supply 700 MW solar modules to Silicon Ranch Updated On Fri, Oct 21st, 2022 by Saurenergy Tennessee based independent power producer, Silicon Ranch and America’s largest solar manufacturer, First Solar, announced the expansion of the 4-GW master supply agreement (MSA) that they signed in April. To support its growing portfolio of contracted solar projects, Silicon Ranch has secured an additional 700 megawatts (MW) of advanced, responsibly produced, thin film photovoltaic (PV) […] Read more
MPUVNL Invites RFP for 15 MW of Grid-Connected Rooftop Solar Plant Updated On Fri, Oct 21st, 2022 by Saurenergy Madhya Pradesh Urja Vikas Nigam Limited (MPUVNL) has invited a Request for Proposal (RFP) for 15 MW of grid-connected rooftop solar plants. These 15 MW rooftop solar PV systems under the RESCO Model would be installed at various locations in Madhya Pradesh. This MPUVNL 35 MW solar tender includes the scope of work in design, […] Read more
FIMER Solar Inverter Solutions Support Yarmouk University with 3.59 MW Capacity Updated On Thu, Oct 20th, 2022 by Saurenergy A recent supply of solar inverters from Italian company FIMER included 14 TRIO-20.0/27.6-TL and 48 PVS-50/60-TL for Yarmouk University’s solar plants. (FIMER Solar Inverter) This unique project, known as the Yarmouk University Project-Phase 2, was erected in 2021 and has a 3.6 MWP capacity powered by 48 FIMER PVS-50/60-TL and 14 TRIO-20.0/27.6-TL, which allows 350 […] Read more
SJVN Green Energy Floats 5.5 MW Solar Tender for Charanka Updated On Thu, Oct 20th, 2022 by Saurenergy Satluj Jal Vidyut Nigam (SJVN) Green Energy has floated a tender for the supply of a 5.5 MW capacity at Charanka solar power project. The last date for submitting the bid for this 5.5 MW tender is November 09, 2022, at 01:00 pm, and bids will be opened on the same day at 01:30 pm. […] Read more