NHPC Opens Bids For 1.2 GW Wind-Solar Hybrid Tender Updated On Thu, Dec 26th, 2024 by Saurenergy NHPC recently issued a tender to select developers for a 1.2 GW wind-solar hybrid project, with or without energy storage systems. The project includes a greenshoe option, and bids are invited until January 16, 2025. The bidders may use technology-agnostic resources such as crystalline silicon, thin film, or CPV technologies, with or without trackers, for […] Read more
NTPC-REL Floats 1.4 GW Tender To Build UP Solar Parks Project Updated On Tue, Dec 24th, 2024 by Saurenergy NTPC Renewable Energy, a subsidiary of NTPC Green Energy, has issued a tender to develop a 1,400 MW grid-connected solar project in two solar parks, namely Lalitpur (2×300 MW) and Chitrakoot (2×400 MW), in Uttar Pradesh (UP). The tender invites bids until January 13, 2025. The tender offers a Balance of System (BoS) package for […] Read more
Assistant Manager CAD (CIVIL -SOLAR PROJECTS ONLY)) Updated On Thu, Dec 19th, 2024 by Saurenergy Responsibilities:- India and Overseas site visits during various phases of the project (pre-bid, construction, Operation and Maintenance) and prepare site visit report, site feasibility assessment and remedial measures for Solar PV plant as per requirement. Review preliminary investigation reports, Geo-technical, topography, hydrology and prepare executive summary from the reports and shall propose best suitable solution […] Read more
Prozeal, Kintech & SAEL Secure GUVNL’s 500 MW Solar Auction Updated On Thu, Dec 19th, 2024 by Saurenergy GUVNL recently announced seven winners of its 500 MW grid-connected solar power projects with an additional 500 MW greenshoe option. Under its Phase XXV auction, it allocated bids to S.B.B. Mouldings, Kintech Synergy, Enertech Fuel Solutions, Prozeal Green Energy, Ausom Enterprise, Drashta Green Power, and SAEL Industries. The tender for this project was released in […] Read more
NHPC Floats 1.2 GW Wind-Solar Hybrid Tender With Greenshoe Option Updated On Wed, Dec 18th, 2024 by Saurenergy In a bid to procure hybrid power, NHPC recently floated a tender to supply 1,200 MW of power from wind-solar hybrid power projects, with a greenshoe option, The tender also said these projects could be established with or without Energy Storage Systems (ESS) anywhere in India. NHPC set 16th January 2025 as the last date […] Read more
Punjab: Gensol Secures 22 MW Solar Project From A Steel Firm Updated On Wed, Dec 18th, 2024 by Saurenergy Indian renewable energy company Gensol Engineering Limited today announced securing the first large turnkey solar project from a steel product company in Punjab. The project involves the development of a 22 MW ground-mounted solar PV power plant, with a total contract value of INR 88 Crore is set to be executed over a 6-month period. […] Read more
NTPC Issues BoS Tender For 1.5 GW Of Solar Project At Bikaner Updated On Tue, Dec 17th, 2024 by Saurenergy NTPC Renewable Energy has recently released a tender to develop a 1.5 GW grid-connected solar project in Rajasthan. It issued this tender through a joint venture with NTPC Green Energy Limited (NGEL) and Rajasthan Rajya Vidyut Utpadan Nigam Limited (RVUNL). The tender offers a ‘Balance of System Package’ to develop the project at RVUNL’s Solar […] Read more
Insolation Energy To Setup Its Solar Cell, Module Unit In MP Updated On Mon, Dec 16th, 2024 by Saurenergy The Board of Directors of Insolation Energy (INA Solar) has now approved the plan to commission its new solar cell, module and Aluminium frame manufacturing facility in Madhya Pradesh. The latest development marks its first investment in solar manufacturing outside Rajasthan. This comes after the Madhya Pradesh government offered land to the company in the […] Read more
Waaree Energies Secures 398 MWp Of Solar Module Orders Updated On Mon, Dec 16th, 2024 by Saurenergy Indian solar module manufacturer Waaree Energies today announced receiving orders for two significant clean energy projects. The company will now supply 398 MWp of solar modules for these two projects. While one order is for 249 MW of modules, another one is a 149 MW of orders. Without disclosing the identity of the client, the […] Read more