Bengaluru’s APM Projects Bags Central Mine Planning & Design Institute’s 5.2 MW Solar Project Updated On Mon, May 1st, 2023 by Saurenergy Bengaluru-based APM Projects has bagged the 5.2 MW solar project by Central Mine Planning & Design Institute. The project has been won through competitive bidding. The tender is for the design, engineering, supply and procurement, construction, erection, fabrication, commissioning, testing, operation and maintenance of five years of grid connected ground mounted solar power plant of […] Read more
Trina Solar’s Module Shipments Total 140 GW, 210mm Modules Cross 65 GW Updated On Mon, May 1st, 2023 by Saurenergy In its recently pusblished full year 2022 and Q1 2023 financial results report, Chinese photovoltaics firm Trina Solar has said its annual revenue stands at $12.645 billion (RMB 85.052 billion), seeing an increase of 83.41% on 2021. The main businesses of the firm, including PV products, PV system and smart energy all registered strong growth. […] Read more
Trina Solar Launches Vertex S+ Series At Solar Show Africa 2023 Updated On Thu, Apr 27th, 2023 by Saurenergy Trina Solar, a global solar and smart energy total solution provider, has announced the launch of its latest innovation, the Vertex S+ 445W+ n type dual-glass modules at the 2023 Solar Show Africa held in Johannesburg. As per the firm, the new modules are specifically designed for rooftop PV systems, offering a combination of durability, […] Read more
MMRDA Solicits Bids for Commissioning of 7.1 MW Rooftop Solar Project Updated On Thu, Apr 27th, 2023 by Saurenergy The Mumbai Metropolitan Region Development Authority (MMRDA) has issued a tender for the design, engineering, manufacture, supply, storage, civil work, erection of suitable structure, testing and commissioning of rooftop solar PV project including operation and comprehensive maintenance (O&M) of the project in RESCO Model for a period of 25 Years at station/site of Mumbai metro […] Read more
Himachal Pradesh Power Corp Solicits Bids for EPC, O&M for 10 MW Solar Project Updated On Mon, Apr 24th, 2023 by Saurenergy Himachal Pradesh Power Corporation Limited has invited bids for the design, supply, construction and erection testing commissioning and operation and maintenance for 08 years of 10 MW AC solar power project at Gondpur Bulla, Una. The last date and time to download bidding/ tender documents is May 19, 2023 at 1200 Hrs. The last date […] Read more
ANERT Issues RFS for EPC & Mfg Agency for Implementation of 2 MW Solar Power Plant Updated On Wed, Apr 19th, 2023 by Saurenergy Agency for New and Renewable Energy Research and Technology (ANERT) has issued an RFS (Request for Selection) for agency for the implementation of 2 MW solar power plant at Travancore Titanium Products Ltd, Kochuveli, Thiruvananthapuram under Solar City Project funded by Smart City Thiruvananthapuram Ltd. The last date to submit the bids is 26 April, […] Read more
Spain’s First Hybrid Wind-Solar Plant To Be Brought To Reality By Iberdrola Updated On Tue, Apr 18th, 2023 by Saurenergy Iberdrola is building the first hybrid wind and solar plant in Spain that will come up in Castilla y León region in the province of Burgos. Iberdrola held that it’s constructing two solar PV plants of 41 and 33 MW each. Both solar projects will employ more than 170,000 solar modules and will be located […] Read more
Astronergy To Supply 200 MW Modules For Five Romanian Solar Projects Updated On Tue, Apr 18th, 2023 by Saurenergy In a key development to hasten the solar power expansion in Romania, a contract has been signed between Chinese solar module maker Astronergy and EXIMPROD GRUP of Romania on 200MW ASTRO N n-type TOPCon PV modules. This was done after the visit of EXIMPROD GRUP delegation to Astronergy Haining Manufacturing Base recently. EXIMPROD GRUP claims […] Read more
Godrej & Boyce Bags Tender for Durgapur Solar Project of 20 MW Updated On Mon, Apr 17th, 2023 by Saurenergy Durgapur Projects Ltd had floated an e-tender cum reverse auction for design and engineering, manufacture, procurement, supply, erection, testing and commissioning of total 20 MW (ph i 8 MW, ph ii 7 MW and ph iii 5 MW) grid connected ground mounted solar photovoltaic power plants at Durgapur. The 20 MW project has been bagged […] Read more