First Solar to deliver 160 MW of PV Panels to Turkish Companies Updated On Fri, Aug 12th, 2016 by Saurenergy US-based thin-film solar modules supplier First Solar has won two large contracts of 160 MW in direct current (DC) from Turkey based energy company. The US Company has gone into agreement to supply 160 MW of its high-performance solar modules to PV projects in Turkey. The two contracts were signed in the first half of […] Read more
SECI invites bids for 100 MW Grid PV project with Battery Energy Storage System in Kadapa Solar Park, AP Updated On Wed, Aug 10th, 2016 by Saurenergy Solar Energy Corporation of India Limited (SECI) is inviting bids for selection of Solar Power Developers for setting up of 100 MW Grid connected solar PV projects along with large scale battery energy storage system at Kadapa Solar Park, Andhra Pradesh. The tender come as part of National Solar Mission (NSM) Phase-II, Batch-IV. Interested bidders […] Read more
Darwin International Airport completes its first phase of 5.5MW solar farm Updated On Fri, Aug 5th, 2016 by Saurenergy Darwin International Airport has completed first phase of 5.5MW solar farm, switching on 4MW installation that will ultimately supply 25 percent of airport’s power needs. It is believed to be the world’s largest airport solar system. The Darwin Airport solar plant array, which is a $13 million project, will be adding another 1.5MW in phase […] Read more
SECI invites bids for 10MW Solar PV Project at Paradip port Trust premises in Odisha Updated On Wed, Aug 3rd, 2016 by Saurenergy Solar Energy Corporation of India Limited (SECI) on behalf of Paradip port Trust is inviting bids for selection of EPC Contractor for Design, Engineering, procurement and Supply, construction and Erection, Testing, Commissioning, Associated Transmission system and comprehensive Operation and Maintenance for 10 years of grid connected 10 MW (AC) Solar PV Project at Paradip port […] Read more
Chandigarh gets Floating Solar Power Plant with Dual-axis Tracking Technology Updated On Mon, Jul 25th, 2016 by Saurenergy A 10kw peak (kWp) of floating solar power plant pilot- the peak power has been commissioned at Dhanas Lake amid efforts by the government to flourish Chandigarh as a solar city. The Peak Power floating solar plant has been engineered to supply power to fountains at the lake for aeration. The USP of the plant […] Read more
NALCO Inviting Bids For 20MW Solar PV Project in Madhya Pradesh Updated On Fri, Jul 22nd, 2016 by Saurenergy National Aluminium Company Limited (NALCO), a Navratna CPSE under Ministry of Mines, Govt. of India inviting bid for setting up a 20MW solar PV project in Madhya Pradesh. The identified Govt. revenue land of approximately 55.62 hectare bearing Khasra Number 892,860,909,914,908,917,921,919,974,975,976 at Palra village, Susner Tehsil, Agar Malwa Dist of M.P, as per the requirement […] Read more
New Studies exhibits the True Costs of Fossil Fuels & Value of Solar Photovoltaics Updated On Wed, Jul 20th, 2016 by Saurenergy Two new studies published in Review Journal (MRS E and S) MRS Energy and Sustainability, by Carol Olson and Frank Lenzmann emphasizes the true economic, social and environmental benefits of solar PV compared to fossil fuels, in regards to the supply chain of all relevant fuels. In their new studies, Authors Carol Olson and Frank […] Read more
Import of solar cells, modules increases by more than three times in India Updated On Tue, Jul 19th, 2016 by Saurenergy Imports of solar cells and modules have increased by over three times from Rs 5,051 crore in 2014-15 to Rs 15,523 crore in 2015-16. The solar industry in India is certainly having good times as the installations soar and investment increases. Early this year in April the import of solar modules and cell stood at […] Read more
SECI invites bid for 2.5 MW Grid Connected Roof Top Solar project in Delhi Updated On Thu, Jul 14th, 2016 by Saurenergy As part of the Jawaharlal Nehru National Solar Mission, the Solar Energy Corporation of India (SECI) has issued a tender on behalf of SDMC for Implementation of 2.5MW Grid Connected Roof Top Solar PV System Scheme. Successful bidders have to carry out Design, Engineering, Manufacture, Supply, Storage, Civil work, Erection, Testing & Commissioning of the […] Read more