Tata Power Solar Adds 210MWp NTPC Award To EPC Portfolio Updated On Thu, Jun 3rd, 2021 by Saurenergy Tata Power Solar, India’s largest integrated solar company and a wholly-owned subsidiary of Tata Power, has received “Letter of Award” (LoA) to build 210 MWp of Solar PV projects for NTPC. The total order value of the projects is approximately Rs 686 crore. The commissioning date has been set for November, 2022. With this addition, […] Read more
Adani Solar Bags Top Performer at PVEL PQP Awards Updated On Wed, May 26th, 2021 by Saurenergy The Solar PV manufacturing and EPC arm of Adani Group, Adani Solar today announced that it has secured the ‘Top Performer’ rank in PV Module Product Qualification Program (PQP) in the seventh annual PV Module Reliability Scorecard of PVEL (PV Evolution Labs LLP). Adani Solar has secured this rank for the fourth time in a […] Read more
Say Goodbye To 2020’s Low Solar Bids, As Price Hikes Continue In Modules, Cells Updated On Wed, May 26th, 2021 by Saurenergy The record low prices last seen in GUVNL’s 500 MW auction, when NTPC won with a bid of Rs 1.99/ unit, may be a distant memory as solar equipment prices continue their upward march in 2021. Those low prices in the last big auction of 2020, blamed on NTPC flexing muscle and projections of a […] Read more
Tata Power Solar Systems Bags Rs. 188 Crore EPC Contract From NHPC Updated On Wed, May 26th, 2021 by Saurenergy NHPC, an Indian government hydropower board under the ownership of Ministry of Power, announced yesterday its placement of an order amounting to Rs 188.19 crore with Tata Power Solar Systems Ltd, a Mumbai-headquartered solar energy services provider, to set up a 40 MW solar power project at Ganjam, in Odisha. Tata Power Solar, a wholly-owned […] Read more
IREDA Opens Applications for Solar Module Manufacturing under PLI Updated On Wed, May 26th, 2021 by Saurenergy Indian Renewable Energy Development Agency (IREDA) yesterday invited applications for setting up manufacturing capacities for vertically integrated high-efficiency solar photovoltaic modules under the production-linked incentive (PLI) scheme. The agency will accept applications till June 30, 2021 and it will open bids on 1 July 2021. The PLI scheme, which aims to further domestic manufacturing of high-efficiency […] Read more
Chhattisgarh Invites Bids From Solar Modules Suppliers Updated On Tue, May 25th, 2021 by Saurenergy The Chhattisgarh State Renewable Energy Development Agency (CREDA) has invited bids from the developers or suppliers for standardization of rates for the supply of solar modules of different capacities (75W-315W) for solar application in the state. The modules need to come with ten years onsite warranty conforming to the Bureau of Indian Standards (BIS) and […] Read more
In a Tumultuous Year, Utility-Scale Solar Installations Decline 39% in FY21 Updated On Thu, May 20th, 2021 by Saurenergy According to a new report by JMK Research, about 3.5 GW of new utility-scale solar capacity was added in India in the fiscal year 2021 (April 2020-March 2021). Compared to the previous year (FY20), installations were about 39% lesser. While the wind capacity of the country increased by 1.5 GW in FY2021, it was found […] Read more
Okaya Power Commissions 100 kW Hybrid Solar Plant in Himachal Updated On Thu, May 20th, 2021 by Saurenergy Okaya Power has commissioned a 100 KWp hybrid solar plant at its manufacturing unit at Baddi in Himachal Pradesh. Okaya Power has announced that it has commissioned a 100 KWp hybrid solar plant at its manufacturing unit at Baddi in Himachal Pradesh. The plant is expected to generate around 144 MWh of clean energy annually according to the company, and further help […] Read more
ReNew Power Goes with Gujarat For Solar Component Manufacturing Plant Updated On Tue, May 18th, 2021 by Saurenergy Leading renewable energy firm ReNew Power has announced that it will be going to Gujarat for the development of a solar cell and module manufacturing plant. The manufacturing plans had been announced by ReNew Power last year, and it has picked the Dholera Special Industrial Region (DSIR), about 100 km away from Ahmedabad . Gujarat, […] Read more