Lakshmi Machine Works to Commission its First Solar Power Plant Updated On Wed, Mar 20th, 2019 by Saurenergy The 10 MW photovoltaic solar power generating facility will come up at Kondampatti in Coimbatore district. Coimbatore-based Lakshmi Machine Works has forayed into solar power generation, with its first facility to be inaugurated on March 24, 2019, in Tamil Nadu. The 10 MW photovoltaic solar power generating facility will come up at Kondampatti in Coimbatore […] Read more
Rioglass Solar Signs Contract For World’s Largest CSP Plant Updated On Mon, Mar 18th, 2019 by Saurenergy Rioglass Solar signs Dubai 600 MW CSP Project order for both parabolic trough receiver tubes and mirrors with Abengoa Energía and Shanghai Electric. The record-breaking Dubai 700 MW CSP + 250 MW PV Hybrid Project Noor Energy 1, developed by ACWA Power in close cooperation with DEWA, Shanghai Electric Group Corporation as EPC, and Abengoa […] Read more
SECI Issues Tender For 2000 MW Solar Projects Under CPSU-II Updated On Mon, Mar 18th, 2019 by Saurenergy The projects will be developed on a Build-Own-Operate basis and the usages charges to be paid by the govt entities for the power has been set at a maximum of Rs 3.50/kWh. The Solar Energy Corporation of India (SECI) has issued a Request for Selection (RfS) document for the selection of Solar Power Developers (SPD) for […] Read more
SECI Extends Deadline For 3 GW Manufacturing Linked Solar Tender Updated On Mon, Mar 18th, 2019 by Saurenergy The deadline for submission has been extended from March 18, 2019, to April 4, 2019. The Solar Energy Corporation of India (SECI) has extended the deadline for bid submission on its tender for setting up 3 GW ISTS-Connected solar PV power plant linked with setting up of 1.5 GW (per annum) solar manufacturing plant. The […] Read more
University of Allahabad Issues 50 kW Solar Tender Updated On Thu, Mar 14th, 2019 by Saurenergy The last date of bid submission is March 25, 2019. The SS Khanna Girls Degree College, Prayagraj on behalf of the University of Allahabad has issued a tender, inviting bids from original equipment manufacturers having their own cell and module manufacturing plant in India to set up a 50 kW rooftop solar PV power plant […] Read more
5 Big Hurdles that have Emerged for India’s Solar Power Producers Updated On Mon, Mar 11th, 2019 by Saurenergy After installations of almost 10 GW and above in 2017 and close to 8 GW in 2018, the solar sector is facing its biggest challenge yet, as hurdles have emerged for the continued growth of the sector. Some of these challenges were always there, they are only bigger now, while others have emerged with time. […] Read more
Dairy Industry Exemplary to Exploit Solar Process Heat Updated On Fri, Mar 1st, 2019 by Saurenergy At 176.4 million tonnes annually, India is the global milk and milk products producer. There are over 1,200 large, medium & small dairy industries. The dairy industry is dominated by the co-operative sector with 60% of the installed processing capacity in this sector. Milk processing in India constitutes around 35% of total milk production, of […] Read more
Second Tender For 5 MW Rooftop Solar Issued in Maharashtra Updated On Wed, Feb 27th, 2019 by Saurenergy The last date of bid submission is March 04, 2019. The Public Works Department (PWD) of Amravati has issued another tender inviting bids for selection of developers to set up cumulative 5 MW of solar capacity rooftop projects at various places distributed in 309 rest houses in different districts of Maharashtra. The rooftop solar projects […] Read more
Tender For 2 MW Rooftop Solar Issued in Maharashtra Updated On Sat, Feb 23rd, 2019 by Saurenergy The last date of bid submission is February 26, 2019. The Public Works Department (PWD) of Amravati has issued a tender inviting bids for selection of developers to set up cumulative 2 MW of solar capacity rooftop projects at various places distributed in 12 electrical divisions and approximately 63 rest houses in different districts of […] Read more