Canadian Solar’s PV Manufacturing Faces Minimal Impact of Covid-19 Updated On Thu, Apr 30th, 2020 by Saurenergy Canadian Solar, a leading solar photovoltaic (PV) module manufacturer, has recently revealed that it had experienced the limited impact of the coronavirus outbreak on its production facilities based in China. Although the company faced severe disruptions from January-mid by way of capacity loss amidst the COVID-19 carnage, it did not have a large impact on […] Read more
Dropping Prices of Solar, Wind and Storage a Risk for Existing Coal, Gas: BNEF Updated On Thu, Apr 30th, 2020 by Saurenergy According to a new analysis, solar PV and onshore wind are now the cheapest sources of new-build generation for at least two-thirds of the global population. The latest analysis by research company BloombergNEF (BNEF) shows that the global benchmark levelised cost of electricity, or LCOE, for onshore wind and utility-scale PV, has fallen 9 percent […] Read more
China’s Solar Additions for 2020 Likely to Decline by 6.6 GW: Report Updated On Tue, Apr 28th, 2020 by Saurenergy On the back of widespread coronavirus outbreak and its impact, China’s solar photovoltaic (PV) capacity additions for 2020 is expected to fall short by 6.6 GW against the earlier projections, said the data and analytics company. Earlier, Chinese solar PV capacity additions were projected at 40 GW for the current year, which is higher than […] Read more
Trina Solar Reports 515.8 W Output for its Vertex Module Updated On Tue, Apr 28th, 2020 by Saurenergy Trina Solar has announced that its Vertex module is able to reach 515.8W power output, based on the test result by TÜV Rheinland’s independent evaluation. China-based solar module manufacturer Trina Solar has announced that its Vertex module is able to reach 515.8W power output, based on the test result by TÜV Rheinland’s independent evaluation. This […] Read more
Inox Wind Opens All Manufacturing Facilities with Permission from Local Authority Updated On Mon, Apr 27th, 2020 by Saurenergy Inox wind, a leading Wind Energy Solutions provider in India, has reopened its manufacturing facilities across the country. After lockdown order issued by the government in the wake of containment of coronavirus pandemic, Kailash Tarachandani-led company had earlier on March 26, 2020 suspend operations at all its three manufacturing sites situated at Ahmedabad, Barwani and […] Read more
In China, a Mixed Bag of Results And News from Solar Majors in Q1 Updated On Wed, Apr 22nd, 2020 by Saurenergy Close on the heels of a strong recovery in March this year, right after the worst of the Covid-19 imposed lockdowns in the country, major China-based firms have declared a mixed set of news, guidance, and results. Bringing up the tough news was Sunpower, a manufacturer of cells and modules, which has idled its plants […] Read more
CEL Seeking Vendors for 1000 Kgs of Solar PV Ribbon Updated On Mon, Apr 20th, 2020 by Saurenergy CEL has issued a tender, seeking eligible bidders/ vendors for the supply of 1000 kgs of solar PV ribbon of width 5 mm and thickness 0.3 mm. The Central Electronics Limited (CEL) has issued a tender, seeking eligible bidders/ vendors for the supply of 1000 kgs of solar photovoltaic (PV) ribbon of width 5 mm […] Read more
The Next Big Push. MNRE Unveils Moves to Push Manufacturing Updated On Sat, Apr 18th, 2020 by Saurenergy The Renewable energy sector, where private sector involvement has been considered critical to its growth and building further capacities, has got a new push, as far as manufacturing in India goes. This comes on the heels of the many efforts made last year to provide support for domestic manufacturing, fro the DCR (domestic content requirements) […] Read more
India’s Solar Energy Plans Bogged Down With Supply Chain Issues Updated On Wed, Apr 8th, 2020 by Saurenergy Amid lockdown across the country, which is likely to be extended due to ongoing coronavirus pandemic, the damage to India’s solar ambitions is given, the only question is how much. In India, around 2.3 GW of solar plants were expected to be commissioned from June to August 2020. However, the delivery of these projects has […] Read more