Why Is The Building Sector Shunning Glasses & Adopting Solar? Know The Benefits Updated On Wed, Apr 26th, 2023 by Saurenergy Several industrial high-rise buildings in the last decade have undergone a construction-related transition. Against the earlier popular and conventional practice of using concrete surfaces, many modern buildings now flaunt flashing glass shields. Not only did the new practice help in making those buildings more eye-catching, but it also aided in increasing the energy efficiency […] Read more
JERC Rejects Plea of Puducherry Firm For Enhancing Net Metering Limit For Captive Solar Updated On Wed, Apr 26th, 2023 by Saurenergy The Joint Electricity Regulatory Commission for the State of Goa & Union Territories has rejected the petition filed by Puducherry-based Rane Brake Lining, seeking relaxation of provision 4.4 of JERC for State of Goa and UTs (solar PV grid interactive system based on net metering) Regulations 2019. The provision imposes a cap on maximum solar […] Read more
The Top 5: Risks to Renewable Energy from Climate Change Updated On Tue, Apr 25th, 2023 by Saurenergy Climate change has already started posing real-world challenges. It is not just affecting adversely the developmental plans but is also disrupting the livelihoods of a considerable section of the human population in the regions prone to climate change disasters such as floods, droughts, sea level rise, etc. Renewable energy (RE) has given a push developmental […] Read more
Haryana Solicits Bids for Procurement of 500 MW Solar Power Updated On Mon, Apr 24th, 2023 by Saurenergy Haryana Power Purchase Center, which is a joint venture between UHBVN (Uttar Haryana Bijli Vitran Nigam) and DHBVN (Dakshin Haryana Bijli Vitran Nigam) has issued a tender and invited bids for 500 MW solar electricity from Haryana-based grid connected solar projects. The last date to submit the bids online is May 24, 2023. The bids […] Read more
Himachal Pradesh Power Corp Solicits Bids for EPC, O&M for 10 MW Solar Project Updated On Mon, Apr 24th, 2023 by Saurenergy Himachal Pradesh Power Corporation Limited has invited bids for the design, supply, construction and erection testing commissioning and operation and maintenance for 08 years of 10 MW AC solar power project at Gondpur Bulla, Una. The last date and time to download bidding/ tender documents is May 19, 2023 at 1200 Hrs. The last date […] Read more
Gautam Solar Supplies Mono Half-Cut Solar Panels For Bhopal Airport Updated On Mon, Apr 24th, 2023 by Saurenergy Gautam Solar, one of India’s indigenous solar manufacturers, has now supplied 10 BB (Bus Bar) Mono Half-Cut Solar Panels for a solar plant for the Raja Bhoj International Airport of Bhopal. The move is likely to boost the use of renewable energy to cater to the airport’s power needs in the state capital of Madhya […] Read more
X-ELIO Gets Financial Closing Of EUR 102mn For Spanish Solar Projects Updated On Sun, Apr 23rd, 2023 by Saurenergy Global renewable energy player X-ELIO has closed a financing deal for three solar power projects located in the Spanish region of Extremadura. The three solar projects are , Los Llanos I, II and III, that will specifically come up in Medina de las Torres municipality, Badajoz, Spain. X-ELIO has secured EUR 102 million for the […] Read more
Wartsila Wins Contract For Delivering Australia’s Largest Energy Storage Project Updated On Thu, Apr 20th, 2023 by Saurenergy Origin Energy has selected technology group Wartsila as their preferred contractor to deliver energy storage solutions for Australia’s largest energy storage projects in the first phase. The project in its first phase has plans to have 460 Megawatt (MW) and 920 MW of energy storage systems. These Eraring batteries will be stationed at Origin’s Power […] Read more
NTPC Floats Tender For 9,000 MWH Of ISTS-Connected Energy Storage Systems Updated On Thu, Apr 20th, 2023 by Saurenergy The National Thermal Power Corporation Renewable Energy Limited (NTPC REL) has now invited online bids from developers for a 9,000 Megawatt-Hour (MWH) of Inter-State Transmission System (ISTS)-connected energy storage solution. The tender said the plant(s) could be based anywhere in India. The minimum capacity of the same should be 1,500 MW, the tender said. NTPC […] Read more