Hybrid Inverters Allowed Under PM Surya Ghar Scheme: MNRE Updated On Mon, Sep 23rd, 2024 by Saurenergy The Ministry of New and Renewable Energy (MNRE) recently released a document clarifying operational guidelines on the implementation of the PM Surya Ghar: Muft Bijli Yojana. The new clause widened the technologies included under the CFA offered to residential consumers. The new clause as per the latest document issued by the MNRE included additional technologies […] Read more
ICRA Sees FDRE, RTC Projects As Key Drivers Of India’s RE Growth Updated On Mon, Sep 23rd, 2024 by Saurenergy A recent report by the Investment Information and Credit Rating Agency (ICRA) foresees a rise in renewable energy capacity in the next six years in India. It is estimated that the share of renewable energy (RE), plus large hydro, in all-India electricity generation, will increase to over 35% in FY2030 from 21% in FY2024. ICRA […] Read more
Tata Power Renewable Energy Secures 400 MW Hybrid Project from MSEDCL Updated On Wed, Sep 18th, 2024 by Saurenergy Tata Power Renewable Energy Limited (TPREL), the green arm of the Tata Power Company Limited, has successfully secured a Letter of Award (LoA) from the Maharashtra State Electricity Distribution Company Limited (MSEDCL), a wholly owned entity under the Maharashtra Government, for the development of a 400 MW Wind-Solar Hybrid project in Maharashtra. The LoA includes […] Read more
Jindal India RE Targets BESS Market With 5 GWh Capacity Updated On Wed, Sep 18th, 2024 by Saurenergy Jindal India Renewable Energy, a part of the BC Jindal Group, announced its foray into the Battery Energy Storage Systems (BESS). The company plans to build 1 GWh battery pack assembly line with LFP chemistry by 2025 and will foray into battery cell manufacturing with 5 GWh capacity by 2027. To achieve this, the company […] Read more
Independent Engineering Senior Consultant Updated On Wed, Sep 18th, 2024 by Saurenergy Focus on providing various clients with engineering advice and technical solutions on different projects Key Accountabilities:- Technical due diligence, techno-economic viability, feasibility studies, detailed project reports covering review of technology, design, contracts, infrastructure, permits and clearances, land area analysis, risk analysis, financial model. Should have strong knowledge of Contracts and Agreements for the development of […] Read more
Manager Renewable Engineering (Control & Instrumentation Engineer) Updated On Tue, Sep 17th, 2024 by Saurenergy We are seeking a leading role in the Renewable Engineering Control & Instrumentation (C&I) division for our Renewable Energy (RE) Power Plants which will be a mix of Solar, Wind, and BESS systems. This position is responsible for C&I engineering which includes major development of control architecture of complete solar + wind + BESS Hybrid […] Read more
System Design Engineer Updated On Tue, Sep 17th, 2024 by Saurenergy Roles & Responsibilities:- In-house drawings and technical specifications for electrical works (BOM, BOQ, RFP) Design & Drawing of electrical systems for medium and large-scale PV systems (DC, AC, LV, HV, communication systems/SCADA, Earthing, Lightning protection and Illumination Calculation). Preparation of Design Documents such as RFP, GTP etc. Preparation of drawing for various projects such as […] Read more
SJVN Invites Bids For 600 MW/2,400 MWh ESS Across India Updated On Mon, Sep 16th, 2024 by Saurenergy SJVN, in coordination with the Renewable Energy Implementation Agency (REIA), has released a 1.2 GW tender for solar plus energy storage. The tender invites bids from Solar Power Developers (SPDs) to set up ISTS-connected Solar PV Power Projects with 600 MW/2,400 MWh Energy Storage Systems (ESS) anywhere in India under Tariff-Based Competitive Bidding on a […] Read more
SECI Awards 1 GW/2 GWh BESS Project to JSW And Reliance Updated On Mon, Sep 16th, 2024 by Saurenergy SECI has announced that JSW Neo Energy and Reliance Power are the successful bidders for 1,000 MW/2,000 MWh standalone battery energy storage systems (BESS), under tariff-based global competitive bidding. Both companies were awarded an equal capacity of 500 MW/1,000 MWh. JSW Neo Energy quoted a tariff of Rs. 381,000/MW per month, and Reliance Power quoted […] Read more