Belectric Builds Solar System for Netherlands’ 1st Green Hybrid Project Updated On Mon, May 25th, 2020 by Saurenergy German solar power specialist Belectric undergoes construction of a solar power system for Vattenfall’s first complete hybrid power plant called Haringvliet Zuid energy park. This park will consist of a wind farm of 22 MW of capacity, a battery storage system of 12 MW of capacity and a large-scale photovoltaic (PV) system constructed and commissioned […] Read more
BHEL Tenders for BOS Works for 22 MW Floating Solar Plant for NTPC Project in Kerala Updated On Mon, May 25th, 2020 by Saurenergy State-owned Bharat Heavy Electricals Ltd (BHEL) has floated tender inviting bids from eligible bidders for the balance of systems (BOS) works for 22 MW floating solar plant for NTPC project in Kerala. Interested bidders can submit their bids starting from today i.e. May 25, 2020, from 9:00 a.m. onwards, and the last date for submitting […] Read more
Engie in Final Talks with Hawaiian Electric for Solar plus Storage Project Updated On Mon, May 25th, 2020 by Saurenergy French multinational electric utility Engie said that its project has been selected by the US-based Hawaiian Electric as one of the 16 in the final award group for the stage 2 variable renewable dispatchable generation and energy storage projects. Further, the proposed project, a 60 MWAC solar energy + 240 MWh of the battery storage […] Read more
Cochin Port Trust Seeks Developers for 1.5 MW Floating Solar Project Updated On Fri, May 22nd, 2020 by Saurenergy State-owned Cochin Port Trust has issued an electronic tender inviting bids for setting up of 1.5 MWp grid connected floating solar photovoltaic (PV) power project at CoPT. The scope of project work includes site survey, design, engineering, manufacture, supply, storage, civil work, erection, testing, commissioning of this grid connected floating solar project in the Backwaters […] Read more
SECI Issues NIT for Setting Up of 10 MW Grid Connected Solar Plant in Rajasthan Updated On Fri, May 22nd, 2020 by Saurenergy State-owned Solar Energy Corporation of India (SECI) on Friday has revealed its plan for setting up of 10 MW grid-connected solar photovoltaic (PV) power plant in Rajasthan. In this regard, the nodal agency has issued a notice inviting tender (NIT) for the “selection of solar power developers for setting up of 10 MW grid-connected solar […] Read more
MNRE Releases Draft Guidelines for Off-Grid Solar Plants; Seeks Stakeholders Comments Updated On Tue, May 19th, 2020 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has released the draft guidelines for implementation of off-grid solar power packs under RESCO mode and model PPA. Also, the notice calls upon industry stakeholders to provide their suggestions and comments on the draft guidelines and draft PPA latest by May 25, 2020. This is in line […] Read more
CEL Tenders for Supply of BOS for Off Grid Solar Water Pumping System in MP Updated On Mon, May 18th, 2020 by Saurenergy State-owned Central Electronics Ltd (CEL) has floated tender inviting online bids for the supply of balance of systems (BoS) for standalone off-grid solar photovoltaic (PV) water pumping systems in Madhya Pradesh (MP). The scope of the tender includes rate contract for design, manufacture, supply, erection, testing and commissioning of BOS for standalone off-grid solar PV […] Read more
Solar Companies Resume Manufacturing Cautiously after Govt Eases Lockdown Norms Updated On Mon, May 18th, 2020 by Saurenergy With India slowly opening up its economic activities again after total shutdown for many days amidst coronavirus lockdown, various companies across the clean energy space, whether top brands or startups are also resuming operations by reopening their factories and offices. Despite lockdown continued, the government has provided permission to various companies across sectors to reopen […] Read more
PV Tracker Firm GameChange Solar Surpasses 10 GW Milestone Updated On Mon, May 18th, 2020 by Saurenergy PV tracker manufacturer GameChange Solar has announced that is has surpassed the 10 GW milestone for sales since the company was founded in 2012. GameChange Solar has announced that is has surpassed the 10 GW milestone for sales since the company was founded in 2012. The company’s rapid expansion has been prompted by growth in […] Read more