Tata Power Wins 20MW Solar plus 50MWh Battery Storage Auction of SECI Updated On Thu, Aug 12th, 2021 by Saurenergy Tata Power Solar, India’s largest solar energy company, and Tata Power’s wholly-owned subsidiary has received a “Notice of Award” (NoA) to build 50MWp Solar PV Plant with 50MWh Battery Energy Storage System (BESS) project at Phyang village in Leh, Ladakh. The order value of the project is ÌNR 386 crores. The commercial operation date for […] Read more
Solar PV Specialist (Contract) Updated On Wed, Aug 11th, 2021 by Saurenergy Key Responsibilities:- Sorts, folds, and files documents. Receives and stamps drawings for internal routing. Enters data using a PC. Assists with distribution of drawings. Prints computer-generated manifests to accompany distribution of drawings. Assists on (supports) small and large projects. Individual contributor with no subordinates. Management Responsibilities:- Individual Contributor. Minimum Qualifications:- Minimum 1 year of relevant […] Read more
Fronius Energy Fuels Buses with Solar-produced Green Hydrogen Updated On Wed, Aug 11th, 2021 by Saurenergy Austrian solar energy solutions provider, Fronius Solar Energy has announced the commencement of a two-week trial of a hydrogen-powered bus in Wels (Upper Austria). The green hydrogen used to fuel the bus is claimed to be 100% locally produced from solar energy. According to the firm, the “Solaris Urbino 12 Hydrogen” trial was launched in […] Read more
HPCL Floats Tender for 628 KW Solar Plants in Tamil Nadu Updated On Wed, Aug 11th, 2021 by Saurenergy Hindustan Petroleum Corporation Limited (HPCL) has issued a new tender, inviting online bids for pre-AMC servicing & CAMC of solar plants, with 628 KW capacity, in HPCL, Chennai New Terminal at NCTPS Main Road, Vallur Village, Tamil Nadu. The bid submission will close on August 15, 2021, at 12 pm, and the earnest money deposit […] Read more
Pakistan to Unveil First Domestically Produced Solar Panels Updated On Tue, Aug 10th, 2021 by Saurenergy Pakistan is gearing up to increase the production and use of renewable energy as a measure to alleviate power shortages. To this end, the country’s government has proposed eliminating taxes associated with the manufacture of solar and wind energy equipment in the country. The University of Engineering and Technology (UET), Lahore, is set to launch the […] Read more
Report Highlights Risks From Inaccurate Irradiation Data To Solar Projects In Africa Updated On Tue, Aug 10th, 2021 by Saurenergy A recent report developed by a solar electricity provider to African enterprises, CrossBoundary Energy (CBE), says that Data irregularities in estimating solar production can have significant impacts on both technical teams and solar buyers. Solar production/ solar irradiation is the measurement of how much sunlight shines in each location and therefore how much electricity a […] Read more
Measuring Solar Irradiation in Africa: A case for change Updated On Mon, Aug 9th, 2021 by Saurenergy This report sheds light on how solar production estimates are made, the specific challenges faced in estimating solar irradiation in Africa today, and the negative consequences CBE has seen as a result of inaccurate estimates. By highlighting this issue, we aim to begin a broader conversation about how to raise the C&I industry standard for […] Read more
IPO Time For India Solar Equipment Manufacturers In 2021 Updated On Mon, Aug 9th, 2021 by Saurenergy After a long wait, initial reports are finally coming out regarding plans by major Indian solar equipment manufacturers planning Initial Public Offers. We refer to a long wait simply because the markets have been buoyant for a while now, and have duly been followed by an IPO wave the likes of which has rarely been […] Read more
Solar PV inverters To Continue Under Self Certification Regime till Dec 31, 2021 Updated On Fri, Aug 6th, 2021 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has issued a notification allowing self certification of Solar Photovoltaic Inverters (SPV) from June 30, 2021, to December 31, 2021. The notification was issued on August 4. The notification does add the condition that the manufacturers doing so must have valid International Electrotechnical Commission certificates and test […] Read more