‘Suns-Voc’ Testing System That Could Become the IoT of Photovoltaics Updated On Mon, Dec 7th, 2020 by Saurenergy A new system ‘Suns-Voc’ developed by a team of researchers from Arizona State University which can measure solar performance over the long term in scalable photovoltaic systems, is being considered as a breakthrough in the cost and longevity of interconnected power delivery. Solar cells are only “current-voltage” tested in the lab before they are deployed […] Read more
GOGLA Research Paper on Opportunities for Hybrid AC-DC Infrastructure in India Updated On Fri, Dec 4th, 2020 by Saurenergy GOGLA has initiated a whitepaper for a deep dive into the relevance of hybrid AC-DC energy infrastructure in India with the objective of providing insights into how energy-efficient appliances can be integrated with the electricity grid. While this is an emerging consumer need and market for the DRE sector, it also ties with the Government of India […] Read more
Growing Opportunities for Hybrid AC-DC Infrastructure in India: Report Updated On Fri, Dec 4th, 2020 by Saurenergy A new report by GOGLA attempts to deep dive into the relevance of hybrid AC-DC (HAD) energy infrastructure in India A new report by GOGLA attempts to deep dive into the relevance of hybrid AC-DC (HAD) energy infrastructure in India with the objective of providing insights into how energy-efficient appliances can be integrated with the electricity […] Read more
Orient Cement Goes With AMP Energy For Captive Renewable Generation Updated On Fri, Dec 4th, 2020 by Saurenergy Orient Cement, which has plants in Maharashtra, Telangana and Karnataka,has signed up for a 26 percent stake in AMP Solar Systems, a step down subsidiary of AMP Solar Technology. The new firm, which was incorporated in May 2020, will set up a solar power plant in Maharashtra to serve primarily as a captive supplier of […] Read more
Deadline Extended for EOI Submission for RE Solutions in Himalayas Updated On Wed, Dec 2nd, 2020 by Saurenergy SECI has extended the deadline for submission of EOI for its call for RE based solutions for meeting energy needs in remote areas of the Himalayas The Solar Energy Corporation of India (SECI) has issued a notification, extending the last date for submission of Expression of Interest (EOI) for its call for renewable energy (RE) […] Read more
Macquarie Owned Blue Leaf Energy Enters India With Vibrant Energy Acquisition Updated On Tue, Dec 1st, 2020 by Saurenergy Blue Leaf Energy Asia Pte Limited (Blueleaf Energy) has acquired a majority stake in Vibrant Energy Holdings Pte Ltd (Vibrant Energy) from ATN International, Inc (ATN). Vibrant Energy claims to currently have a portfolio of 66 MW of operational solar PV projects, and an active development pipeline of over 400 MW across India. By combining […] Read more
Seraphim Joins the 500w Club, With S4 half Cell Series Updated On Tue, Dec 1st, 2020 by Saurenergy Jiangsu Seraphim Solar System Co., Ltd. (Seraphim), a world-class solar product manufacturer in China, has joined the growing band of manufacturers offering a 500 plus Watt module with the launch of its S4 half-cell series photovoltaic (PV) modules on December 1. Seraphim, which until last year claimed to have over 85 percent of its sales outside […] Read more
Vestas Launches Venture Investment Programme to Accelerate Innovation Within Sustainable Energy Solutions Updated On Thu, Nov 26th, 2020 by Saurenergy Driving on from its success in the wind energy segment, global wind energy major Vestas has announced that to accelerate the deployment of sustainable energy, the electrification of societies and unlock new growth opportunities, it is now launching a new venture investment programme entitled Vestas Ventures. “We want to combine Vestas’ 40 years of experience in pioneering […] Read more
Team Lead – Design Engineering Department Updated On Tue, Nov 24th, 2020 by Saurenergy Managing a team of 2- 3 junior designers & a site surveyor Ensuring all data points are collected by site surveyors Conducting site visits as and when required Coordinating with Business Development team and reverting to their queries regarding potential project sites and the feasibility associated with the same. Preparation of Technical DPR & BOM […] Read more