Jindal India RE Targets BESS Market With 5 GWh Capacity Updated On Wed, Sep 18th, 2024 by Saurenergy Jindal India Renewable Energy, a part of the BC Jindal Group, announced its foray into the Battery Energy Storage Systems (BESS). The company plans to build 1 GWh battery pack assembly line with LFP chemistry by 2025 and will foray into battery cell manufacturing with 5 GWh capacity by 2027. To achieve this, the company […] Read more
Independent Engineering Senior Consultant Updated On Wed, Sep 18th, 2024 by Saurenergy Focus on providing various clients with engineering advice and technical solutions on different projects Key Accountabilities:- Technical due diligence, techno-economic viability, feasibility studies, detailed project reports covering review of technology, design, contracts, infrastructure, permits and clearances, land area analysis, risk analysis, financial model. Should have strong knowledge of Contracts and Agreements for the development of […] Read more
Manager Renewable Engineering (Control & Instrumentation Engineer) Updated On Tue, Sep 17th, 2024 by Saurenergy We are seeking a leading role in the Renewable Engineering Control & Instrumentation (C&I) division for our Renewable Energy (RE) Power Plants which will be a mix of Solar, Wind, and BESS systems. This position is responsible for C&I engineering which includes major development of control architecture of complete solar + wind + BESS Hybrid […] Read more
System Design Engineer Updated On Tue, Sep 17th, 2024 by Saurenergy Roles & Responsibilities:- In-house drawings and technical specifications for electrical works (BOM, BOQ, RFP) Design & Drawing of electrical systems for medium and large-scale PV systems (DC, AC, LV, HV, communication systems/SCADA, Earthing, Lightning protection and Illumination Calculation). Preparation of Design Documents such as RFP, GTP etc. Preparation of drawing for various projects such as […] Read more
SJVN Invites Bids For 600 MW/2,400 MWh ESS Across India Updated On Mon, Sep 16th, 2024 by Saurenergy SJVN, in coordination with the Renewable Energy Implementation Agency (REIA), has released a 1.2 GW tender for solar plus energy storage. The tender invites bids from Solar Power Developers (SPDs) to set up ISTS-connected Solar PV Power Projects with 600 MW/2,400 MWh Energy Storage Systems (ESS) anywhere in India under Tariff-Based Competitive Bidding on a […] Read more
SECI Awards 1 GW/2 GWh BESS Project to JSW And Reliance Updated On Mon, Sep 16th, 2024 by Saurenergy SECI has announced that JSW Neo Energy and Reliance Power are the successful bidders for 1,000 MW/2,000 MWh standalone battery energy storage systems (BESS), under tariff-based global competitive bidding. Both companies were awarded an equal capacity of 500 MW/1,000 MWh. JSW Neo Energy quoted a tariff of Rs. 381,000/MW per month, and Reliance Power quoted […] Read more
SECI Issues Fresh FDRE Tender For 8 GWh (2GW x 4 hours) Updated On Fri, Sep 13th, 2024 by Saurenergy The Solar Energy Corporation of India (SECI) has announced a Firm and Dispatchable Renewable Energy (FDRE) tender for peak supply totaling 8,000 MWh (2,000 MW x 4 hours). The project will be developed on a Build Own Operate (BOO) basis. SECI intends to sign a Power Purchase Agreement (PPA) with the successful bidders for a […] Read more
NHPC Discovers Lowest Tariff Of Rs. 4.37 For 1.2 GW FDRE Project Updated On Fri, Sep 13th, 2024 by Saurenergy NHPC has announced the winners of the 1.2 GW solar project under Tranche II. It allocated the project to five successful bidders: Essar Renewables, Juniper Green Energy, Serentica Renewables, Hexa Climate Solutions, and Avaada Energy. According to the tender results, NHPC allocated Essar, Juniper, and Serentica 300 MW, 200 MW, and 150 MW of capacities […] Read more
NVVN Seeks Bids to Set Up 250 MW/500 MWh Standalone BESS Updated On Tue, Sep 10th, 2024 by Saurenergy NTPC subsidiary, Vidyut Vyapar Nigam Limited (NVVN), recently released a tender for setting up 250 MW/500 MWh standalone battery energy storage systems with viability gap funding support. NTPC released this tender under a tariff-based global competitive bidding request. The last date for bid submission is 17th September 2024. As per the NTPC Vidyut Vyapar Nigam […] Read more