O2 Power Acquires Emmvee Group’s Solar Plant Portfolio of 55 MW Updated On Thu, Aug 25th, 2022 by Saurenergy Delhi-based renewable energy producer, O2 Power has announced the acquisition of several solar power plants from Bangalore-based solar modules manufacturer Emmvee Photovoltaic Power. According to the company, these plants are located in Karnataka and Telangana and have a combined installed capacity of 55MW. A portion of this capacity is used to power state DISCOMs, and […] Read more
Rays Power Commissions 150 MW Solar Plant In Karnataka Updated On Wed, Aug 10th, 2022 by Saurenergy Haryana-based Solar Power Company, Rays Power Infra has announced the inauguration of a 150 MW solar plant (grid-connected) in Raichur and Koppal, Karnataka. Rays Power claims that this project will approximately produce 2,40,000 MW of green energy per year and the entire project has been executed by Rays Power Infra’s in-house EPC team within the […] Read more
JinkoSolar’s Malaysia Plant 100% Renewable Powered Now Updated On Mon, Jun 20th, 2022 by Saurenergy In a welcome development, global module major Jinko Solar has ensured that it’s overseas plant at Malaysia is powered completely by renewable energy. That makes it the first overseas plant to be 100% renewable powered. Jinko Solar was the first company to establish a “vertically integrated” production capacity from silicon material processing to wafer, cell […] Read more
Bokaro Steel Plant to develop twin floating solar power projects Updated On Wed, Jun 8th, 2022 by Saurenergy The Bokaro Steel Plant (BSL) – a subsidiary of state owned Steel Authority of India Limited (SAIL) – has planned for two floating solar power plants on two different water bodies. Garga Dam and Cooling Pond-1 are the identified water bodies that will host the floating solar panels to support the electricity needs of the […] Read more
Tata Power Commissions 300 MW Solar plant in Dholera Updated On Mon, Apr 4th, 2022 by Saurenergy Tata Power Renewables Energy Ltd (TPREL), a wholly-owned subsidiary of Tata Power has commissioned a 300 MW project in Dholera, Gujarat. It is India’s largest single-axis solar tracker system. The project will generate 774 MUs annually. The installation entails 873012 nos. of Monocrystalline PV Modules. The project was commissioned well within the stipulated timeline, according […] Read more
Cochin Airport to Be Power-positive With New Solar Plant from March 6 Updated On Mon, Feb 28th, 2022 by Saurenergy The Cochin International Airport Limited (CIAL), the world’s first airport fully powered by solar energy, is to become power-positive with the commissioning of its new solar power plant near Payyannur in Kannur district of Kerala. Chief Minister of the State Pinarayi Vijayan would inaugurate the 12 MWp solar power plant on March 6, Managing Director […] Read more
ACEN Powers Up Philippines 1st Hybrid Solar-Storage Plant Updated On Thu, Feb 24th, 2022 by Saurenergy ACEN, the listed energy platform of the Ayala Group, has switched on the first hybrid solar and energy storage project of the Philippines. The pilot 40 MW energy storage project located in Alaminos, Laguna, will allow the company to evaluate opportunities to store energy more effectively across the portfolio of ACEN, with the aim to […] Read more
ReNew Power Commissions Gujarat’s 1st Wind-Solar Hybrid Plant Updated On Wed, Feb 9th, 2022 by Saurenergy Indian green firm ReNew Power has commissioned Gujarat’s first wind-solar hybrid project. The plant is set up at the Chlor-Alkali unit of Grasim Industries Ltd., Vilayat district, Bharuch, Gujarat. The official statement of the company says that the first phase of the hybrid project, with 17.6 MW commercial-scale wind-solar, commenced operations last week and is […] Read more
NTPC Invites Tender For RO Plants and Solar Powered ATMs Updated On Wed, Feb 2nd, 2022 by Saurenergy National Thermal Power Corporation Limited (NTPC Ltd.), has notified a tender invitation for Operation and Maintenance (O&M) of Reverse Osmosis (RO) Plants with Solar Powered ATMs and Delivery of Safe Drinking Water at Seven Different Villages around NTPC Sipat, Chhattisgarh, for a period of two years. The deadline for the submission of bids is February […] Read more