Government Finalises Sale Of CEL For ₹ 210 crore, Solar Biz Largest Component Updated On Tue, Nov 30th, 2021 by Saurenergy The Centre on Monday (Nov 29) announced approving strategic disinvestment of Central Electronics Limited (CEL), a public sector enterprise (CPSE) under the DSIR, Ministry of Information and Technology. The sale has happened on the second attempt, after a previous effort in 2016 failed to bear fruit. “The Cabinet Committee on Economic Affairs (CCEA) empowered alternative […] Read more
HPGCL Invites Bids for 10MW Solar Plant at Panipat Thermal Pwr Station Updated On Mon, Nov 29th, 2021 by Saurenergy On behalf of Panipat Thermal Power Station (PTPS), Haryana Power Generation Corporation Limited (HPGCL) has invited bids for the comprehensive operation and maintenance of 10 MW solar photovoltaic (PV) grid-connected power plant at PTPS, Panipat, Haryana, for five years. The tender document gives the following details: Last date for submission of online tender: 27.12.2021 up […] Read more
India At 75 And Beyond. Solar’s Starring Role Updated On Mon, Nov 29th, 2021 by Saurenergy India’s Climate Pledges Prime Minister Narendra Modi’s pledge at the COP26 Climate Summit at Glasgow, not only laid down the roadmap for India to scale up contribution of renewable energy in the overall energy blend, it also set the ball rolling for exploring a new industrial model. India, which is the third largest emitter of […] Read more
Sambhar Salts Seeks Bids for 4000MW Ultra Mega Solar Project in Jaipur Updated On Mon, Nov 29th, 2021 by Saurenergy Sambhar Salts Limited (SSL), a subsidiary of Hindustan Salts Limited, has invited Expression of Interest (EoI) from relevant parties for the development of an ultra mega solar power project, with around 4000 MW capacity, at Sambhar district, Jaipur, Rajasthan. SSL will only provide land (as per the requirement of the project) available at its Sambhar unit, which has […] Read more
Roadmap Ready to Make MP a Leading State in Solar Gen, says CM Updated On Mon, Nov 29th, 2021 by Saurenergy Union Power Minister RK Singh has announced an allocation of Rs 13,000 crore for Madhya Pradesh (MP) for modernisation and infrastructure development in the energy sector, especial solar generation an official said on November 26, according to media reports. The news follows some smart progress made by Madhya Pradesh in terms of adding capacity, as […] Read more
Coal India Subsidiary to Set Up 50MW Solar Plant in Odisha at ₹302 Cr Updated On Mon, Nov 29th, 2021 by Saurenergy Mahanadi Coalfields Limited (MCL), a subsidiary of Coal India will set up a 50 megawatt (MW) solar power plant in Odisha’s Sambalpur at a total cost of Rs 301.92 crore, moving steadily towards its goal to achieve carbon neutrality by 2024. MCL has placed a turnkey order to set-up a 50 MW solar power plant […] Read more
41 MW Floating Solar Plant Completed in South Korea Updated On Fri, Nov 26th, 2021 by Saurenergy Scotra, a local South Korean floating PV specialist has completed construction of a 41 MW floating solar installation for the Korea Water Resources firm. The plant has been built on a reservoir of the Hapcheon Dam in South Korea’s Gyeongsang province. South Korea has set itself a target of 2.1 GW of floating solar by […] Read more
MG Motor Becomes First Auto Firm To Adopt Wind Solar Hybrid Energy Updated On Thu, Nov 25th, 2021 by Saurenergy MG Motor India has partnered with Clean Max Enviro Energy Solutions Pvt Ltd (CleanMax), for the supply of 4.85 MW of wind-solar hybrid power to MG’s manufacturing facility in Halol. With this partnership, MG will abate approximately 2 lakh MT of CO2 over 15 years. Thus, even as auto firms have moved forward across the […] Read more
Power Ministry Issues Order Extending ISTS Benefits to BESS, Pumped Storage Projects Updated On Thu, Nov 25th, 2021 by Saurenergy In an order dated November 23, the Ministry of Power of the Government of India has notified key changes to its existing orders allowing waiver of ISTS (Inter State Transmission Charges) on Wind and Solar Sources. In the latest version, for Wind, Solar, Hydro PSP (Pumped Storage Projects) and BESS projects commissioned upto 30.06.2025, the […] Read more