North Canada to Welcome its Biggest Solar Plant from Mining Group Rio Tinto Updated On Fri, Aug 11th, 2023 by Saurenergy Spain’s mining group Rio Tinto’s Diavik Diamond Mine is set to establish the largest solar power plant across Canada’s territories. The plant will boast of more than 6,600 solar panels. The project will generate close to 4,200 MWh of carbon-free electricity annually for the mine. Commercial production from the operation is slated for completion in […] Read more
SJVN Invites Bids for BOS Package of 75 MW Solar Project Updated On Fri, Aug 11th, 2023 by Saurenergy SGEL (SJVN Green Energy Limited), a subsidiary of SJVN, has issued a tender for the BOS package for a 75 MW (AC) grid-connected solar PV power plant at Jamui in Bihar. The last day to submit bids is August 31, 2023. Bids open on August 31, 2023. The scope of work entails design, engineering, supply, […] Read more
Masen Initiates Prequalification Tender for Third Phase of Solar Power Project in Atlas Mountains Updated On Fri, Aug 11th, 2023 by Saurenergy Morocco’s renewable energy agency, Masen, has kickstarted a prequalification tender for the third phase of a solar power venture. The project is situated in the Atlas mountains. Developers are required to submit prequalification documents by October 20th, with the objective of financing, constructing, and operating the 400 megawatt (MW) Noor Midelt III project utilizing photovoltaic […] Read more
SJVN Arm Issues Tender for BOS Supply, O&M for 200 MW Solar Project Updated On Thu, Aug 10th, 2023 by Saurenergy A subsidiary of SJVN, SJVN Green Energy Limited (SGEL) has issued a tender for the supply of a Balance of System (BOS) package. It also entails O&M services for a 200 MW solar project at Khavda Solar Park, Gujarat. The last date for the submission of bids is September 5, 2023. Bids open on September […] Read more
Better Solar Technology Covers Up For Wind Issues In Hybrid Projects For Adani Green Updated On Wed, Aug 9th, 2023 by Saurenergy Adani Green Energy Limited (AGEL), in its latest financial results for Q1 of FY24, reported a decline in Capacity Utilisation Factor (CUF) for its wind portfolio. It attributed its lower CUF to the Biporjoy cyclone in Gujarat and lower wind speeds in the state. However, the latest investors call of the company to discuss the […] Read more
NTPC REL Wins RUMSL’s 80 MW Floating Solar Project Updated On Wed, Aug 9th, 2023 by Saurenergy NTPC Renewable Energy Limited, a subsidiary firm of energy conglomerate NTPC, has emerged successful in bidding for a 80 MW floating solar project at Khandwa, Madhya Pradesh. The tariff at which the firm won the tender floated by RUMSL (Rewa Ultra Mega Solar Limited) is an impressive INR 3.80 kWh. RUMSL is joint venture between […] Read more
Tata Power Signs MoU With Maharashtra For 2800 MW of PSP Updated On Wed, Aug 9th, 2023 by Saurenergy Tata Power has signed a Memorandum of Understanding (MoU) with the Maharashtra government to develop Pumped Hydro Storage Projects (PSP) with a combined capacity of 2800 MW. The power firm said these projects will likely see an investment of around Rs 1300 crore. The company shared the information in its latest filing before the Bombay Stock Exchange […] Read more
OMC Power Commissions 1 MW Rooftop Solar Installation at KGMU Lucknow Updated On Thu, Aug 3rd, 2023 by Saurenergy Renewable energy firm OMC Power has commissioned a 1 MW rooftop solar installation at the prestigious KGMU (King George’s Medical University) Lucknow. The firm informs that by harnessing solar energy, KGMU is projected to save over 1300 tonnes of CO2 in a calendar year. The MoU between KGMU and OMC Power was signed in February, […] Read more
RECPDCL Issues RFS for Wind Power Developers for 100 MW Wind Power Projects Updated On Thu, Aug 3rd, 2023 by Saurenergy REC Power Development and Consultancy Limited, a wholly owned subsidiary of REC Limited, a Maharatna company under the Ministry of Power, invites bids for the selection of wind power developer(s) for setting up of 100 MW ISTS-connected wind power project(s) in India via tariff-based competitive bidding (TBCB) process on Build Own Operate (B-O-O) basis unedr […] Read more