BHEL Invites Bids for O&M Services for 5 MW Solar Plant, Haridwar Updated On Tue, Dec 27th, 2022 by Saurenergy Bharat Heavy Electricals Limited (BHEL) has invited bids for Operations and Maintenance (O&M services) work of the 05 MW solar power plant at its heavy electrical equipment plant (HEEP) in Haridwar, Uttarakhand. The last date for submitting the bid of this 05 MW of Bharat Heavy Electricals Limited (BHEL) O&M tender is January 06, 2023, […] Read more
Policy Analyst- Solar Energy Updated On Tue, Dec 27th, 2022 by Saurenergy Responsibilities:- Training of new team members on policies such as Electricity Act, Net Metering regulations, open access regulations, DSM regulations etc Creating and maintaining a tracker of all relevant central and state regulations such as CEA, Ministry of Power, SERC, CERC, etc Compile and analyze statistical data using modern and traditional methods to collect it […] Read more
Project /Site Engineer – Solar Rooftop Updated On Tue, Dec 27th, 2022 by Saurenergy The role holder will be responsible for project execution of Rooftop/ Ground-mounted Solar Projects in the KW to MW scale. Responsible for project management and monitoring of site construction activities as per project execution plan. Pre Construction:- Inception and Survey of plant Verification of Roof build Verification of plant Layout Verification of material Checklist During […] Read more
RVUNL Invites Bids for 810 MW STU Connected Solar Tender for RVUN Park, Bikaner Updated On Tue, Dec 27th, 2022 by Saurenergy To establish 810 MW of state transmission utility-connected solar power projects in RVUNL’s Ultra Mega Solar Park in Bikaner, Rajasthan Rajya Vidyut Utpadan Nigam (RVUNL) has requested bids from solar project developers. These projects will be built-own-operate projects. November saw the release of the tender, however, it was quickly withdrawn. The bids must be submitted […] Read more
Spain’s Soltec Supplies 738 MW Solar Trackers to Brazilian Solar Projects Updated On Tue, Dec 27th, 2022 by Saurenergy Spanish multinational solar tracker manufacturer Soltec has announced that it has signed an agreement with solar conglomerates Canadian Solar and SPIC for the supply of SFOne trackers for two Brazilian solar power projects having a cumulative capacity of 738 MW. Work on these two power plants will start in mid-2023. The solar projects will be […] Read more
SuperGreen Software Gives Solar Estimate To Help US Homeowners Reduce Electricity Bills Updated On Tue, Dec 27th, 2022 by Saurenergy US-based SuperGreen Solutions has announced the introduction of its new, software that allows homeowners to get a quick, ballpark solar estimate in less than 60 seconds. The official statement of SuperGreen said that the new software is easy to navigate, and utilizes Google Earth imagery to analyze the roof shape of a household and local […] Read more
Jakson Green To Construct 121 MW Solar Plant for Amplus Solar in Rajasthan Updated On Mon, Dec 26th, 2022 by Saurenergy The Indian Subsidiary of Malaysian oil and gas conglomerate Petronas, Amplus Solar has awarded a significant solar EPC order to Jakson Green, the new energy transition platform supported by the Infrastructure and Renewables giant Jakson Group. Jakson Green will complete and hand over to Amplus Solar in Bikaner, Rajasthan, India, a cutting-edge solar power plant […] Read more
GEDA Invites bid for 1.2 MW Solar Rooftop Plant Tender for District Hospital Updated On Mon, Dec 26th, 2022 by Saurenergy Goa Energy Development Agency (GEDA) has invited bids for 1.2 MW of grid-connected rooftop solar projects at North Goa and South Goa District hospitals, 600 KW for each. The last date to submit the bid is January 20, 2023, and the bids will be opened on the same day. This GEDA 1.2 MW of grid-connected […] Read more
Punjab Govt Grants Rs 60 Crore To Power Piped Water With Solar Updated On Mon, Dec 26th, 2022 by Saurenergy The Punjab government has approved the spending of Rs 60.50 crore to develop solar energy systems for rural piped water delivery schemes in the state, reducing annual electricity costs by Rs 8–9 crore. With a total installed capacity of 8.698 MW, solar energy plants based on net metering would be erected at 970 rural water […] Read more