Five Years After Paris Agreement, Slow Progress On RE Commitments- IRENA Updated On Tue, Mar 16th, 2021 by Saurenergy The International Renewable Energy Agency has released a report including updates on renewable energy and climate change pledges after five years of the Paris Agreement. With the adoption of the Paris Agreement on 12 December 2015, nearly all countries around the world agreed to keep the rise in the average global temperature well below 2 […] Read more
SECI 750 MW Tranche X Wind Auctions- Adani Bids Rs 2.77 to win, Ayana at Rs 2.78 Updated On Tue, Mar 16th, 2021 by Saurenergy Life returned to the Wind Energy pipeline with the first pure wind energy auction by SECI in over 18 months. With a reserve price of Rs 2.99, Adani Renewable Energy walked away with a 300 MW allocation at Rs 2.77/kWh, while Ayana Renewable Power won 300 MW at Rs 2.78. Evergreen Power ventures Mauritius won […] Read more
SJVN Wins 288 MW Of PTC Wind Assets With ₹2000 Cr Bid Updated On Fri, Mar 12th, 2021 by Saurenergy SJVN, a joint venture of the Government of India (GOI) and the Government of Himachal Pradesh , has won the auction for 288 MW of wind power assets spread across Madhya Pradesh, Karnataka, and Andhra Pradesh, owned by Power Trading Corporation India (PTC Limited). PTC India has been on a mission to exit its wind […] Read more
Adani Greens Kamuthi Project Turns Water Positive, Signals The Future for Large Projects Updated On Fri, Mar 12th, 2021 by Saurenergy The announcement of the groups most prestigious and early large project turning water positive will set a benchmark for almost all future projects to follow Adani Green Energy’s 648 megawatt Kamuthi Solar plant in Tamil Nadu, has been declared the first of its scale to be water positive. The announcement is a welcome step by […] Read more
Australia Approves 1.8 GW Hybrid, Plus battery Project Updated On Fri, Mar 12th, 2021 by Saurenergy Australia, where rooftop solar was the big winner till last year, continues to make big strides in redressing the balance with the South Australia government approving a huge project in Goyder South for wind, solar and battery storage. The project, once completed, is expected to take the state to a net 100 percent figure for […] Read more
BCD Decision Sparks Predictable Reactions, Costs To Go Up By 50 p/unit Updated On Fri, Mar 12th, 2021 by Saurenergy Three days after the formal confirmation of government plans to impose an enhanced Basic Customs Duty (BCD) of 25 per cent and 40 per cent on imported solar cells and modules, respectively, the reactions have started coming in thick and fast. Dedicated developers, both those on record and off the record, have expressed their views […] Read more
Orange Signs 20-Year Corporate Renewable PPA With Total in France Updated On Thu, Mar 11th, 2021 by Saurenergy Orange signed a Corporate Power Purchase Agreement (CPPA)1 with Total (Paris:FP) (LSE:TTA) (NYSE:TOT), through its subsidiary Total Quadran – one of the leaders in renewable energies in France. Total will supply Orange with 100 GWh a year of renewable electricity over a period of 20 years. This agreement will thus enable the development, by 2024, of […] Read more
Renewables not Coal & Gas Should be Focus of Vietnam’s Latest PDP: IEEFA Updated On Thu, Mar 11th, 2021 by Saurenergy Vietnam’s draft PDP8 has failed to acknowledge the need of developing a more flexible system that can accommodate a changing technology mix Vietnam’s recently published draft power development plan for 2021-2030 (PDP8) has failed to acknowledge the importance of developing a more flexible system that can accommodate a changing technology mix, according to a new report from […] Read more
40% on Modules & 25% on Cells, MNRE to Impose BCD From April 1, 2022 Updated On Thu, Mar 11th, 2021 by Saurenergy The Ministry of New and Renewable Energy (MNRE) has finally finalised the new Basic Customs Duty (BCD) on solar PV cells and modules. As per an office memorandum, the Ministry is going to impose a 25 percent BCD on solar PV cells and 40 percent duty on solar modules without grandfathering of bid-out projects. However, […] Read more