Vice President Updated On Wed, Jul 3rd, 2024 by Saurenergy Project Leadership: Lead and oversee all aspects of wind energy projects from conception to completion, ensuring they meet safety, quality, and financial targets. Team Management: Build and manage a team of skilled professionals, including project managers, engineers, and support staff, to effectively execute wind projects. Site Selection: Identify suitable locations for wind energy projects, considering […] Read more
IEX June Update- Prices Hold Steady As Demand Rises Updated On Wed, Jul 3rd, 2024 by Saurenergy Indian Energy Exchange (IEX), India’s premier electricity exchange, achieved electricity volume of 10,185 MU in June’24, marking a 24.7% year on year increase. The total monthly volume including certificates at 10,677 MU, increased 19.4% on year-on-year basis. For the first quarter of the fiscal year 2025, IEX achieved electricity volume of 28,178 MU, an increase […] Read more
Mangal Singh Brothers Private Limited Updated On Tue, Jul 2nd, 2024 by Saurenergy Mangal Singh Brothers Private Limited (also known as “MSB”) is the Market Leader in Timing Belts, V Belts, Flat Belts and Timing Pulleys across India. Having operated in this segment since 1970’s, we are associated with Top Quality Brands from Japan and Europe. MSB is capable to catering to wide range of application in various […] Read more
Govt Proposes Timelines For Activating EV Charging Connections Updated On Tue, Jul 2nd, 2024 by Saurenergy The Ministry of Power has now issued a new draft notification to expedite the growth of installation of electric vehicle charging stations. The ministry has also specified a minimum time period for the electricity distribution companies (discoms) to supply electricity connections to the EV charging points/stations which goes to as low as three days for […] Read more
Waaree Receives 900 MW Order From Serentica For Project In Rajasthan Updated On Mon, Jul 1st, 2024 by Saurenergy Mumbai-based Waaree Energies Ltd., India’s largest solar PV modules manufacturer with an aggregate installed capacity of 12 GW as of June 30, 2023 has received a 900 MW module supply deal from Serentica Renewables India Private Limited. Waaree Energies received this contract for a project located in Fatehgarh, Jaisalmer, Rajasthan, India. This project is expected […] Read more
Lead Designer-Panel and Switchboard Updated On Mon, Jul 1st, 2024 by Saurenergy Lead Designer will be responsible for interpreting detailed non-standard switchboard product customer requirements and translating them into the final design package for the shop floor for smoother manufacturing of customized switchboard as a product. Contact field sales and/or the end customer or Consulting Engineer as required to ensure accurate interpretation of the intent of the […] Read more
NTPC-REL Launches Tender For 1200 MW Hybrid Project Across India Updated On Mon, Jul 1st, 2024 by Saurenergy National Thermal Power Corporation Renewable Energy (NTPC-REL), has released a tender, inviting bids for the selection of hybrid power generators on Build Own Operate basis. This project is undertaken to supply 1200 MW of power from ISTS-Connected wind-solar hybrid power projects anywhere in India. the last date for submitting bids is August 7, 2024. The […] Read more
SECI Invites Bids To Select Developers For 400 MW Hybrid Projects Updated On Mon, Jul 1st, 2024 by Saurenergy The Solar Energy Corporation of India (SECI) has now invited proposals for setting up Inter-State Transmission System (ISTS)-connected hybrid power projects in India, on a build-own-operate (BOO) model for an aggregate capacity of 400 MW. The tender invited bids for the inter-state transmission system (ISTS-connected) wind-solar hybrid power projects in India under SECI-Tranche-IX. The last […] Read more
India’s Data Centre Boom Opens Up A Fresh Segment For Green Developers Updated On Mon, Jul 1st, 2024 by Saurenergy By-Tej Prakash Bharadwaj & Manish Kumar Notwithstanding the sluggish growth of data centres in India in the early 2000s, the advent and popularity of AI means that the data center sector in India is now set for a significant expansion matching its status as a regional power. With a total capacity of around 1,000 Megawatt […] Read more