Govt. Confirms Solar Imports Down To $571 million in 2020-21 Updated On Fri, Aug 6th, 2021 by Saurenergy Yesterday, the Union Power and New and Renewable Energy Minister Raj Kumar Singh while addressing the Lok Sabha announced that India’s solar cells and modules imports fell to $571.65 million in the last financial year (FY20-21) from $2.16 billion and $1.68 billion in FY18-19 and FY19-20, respectively. Till July end, India had imposed tariff and […] Read more
REMCL Invites Bids for 210 MW Solar Projects on Vacant Railway Land Updated On Thu, Aug 5th, 2021 by Saurenergy Railway Energy Management Company Limited (REMCL), a joint venture of the Indian Railways and RITES Limited (Rail India Technical And Engineering Services Limited, a railway PSU), has issued a new tender to develop 210 MW of grid-connected solar projects under the Domestic Content Requirement (DCR) category. The solar projects are to be developed on vacant railway […] Read more
Corporates Almost Match Utilities As Solar Installs Hit New High In the US Updated On Tue, Aug 3rd, 2021 by Saurenergy A report by the American Clean Power Association (ACPA) highlights the key role played by corporate demand in solar power, with the 2020 numbers as reference. Residential rooftop continues to provide a strong support to the market on the back of state subsidies. In 2020, the amount of solar installed in the US was 4000% […] Read more
Engineer -Solar Updated On Tue, Aug 3rd, 2021 by Saurenergy DNV Energy Systems, Bangalore office is looking for a bright and passionate individual to be part of the Solar team. Position Description:- In this role, you will be directly reporting to Head of Section- Solar. Broad Expectations: Responsible for the delivery of solar consulting services targeted towards project developers, lenders and investors and primarily related […] Read more
Solar Structural Design Engineer Updated On Tue, Aug 3rd, 2021 by Saurenergy In depth knowledge of various IRC Codes, RDSO and other codes as applicable. Design major structures. (Bridges, Grade Separators, Interchange, Retaining wall, Steel structures, Foundations etc.) Good knowledge of AUTOCAD, ETAP CIVIL, STAD PRO, REVIT etc or other computer aided design software. Draw and draft the drawings and designs and give inputs for modifications. Coordinate […] Read more
Indian Government Allocated Rs. 756.66 Crore Under FAME Scheme till June 2021 Updated On Tue, Aug 3rd, 2021 by Saurenergy The government has allocated over Rs. 756.66 crores under the FAME scheme, out of which Rs. 53.27 crores have been utilized till June 2021. The Indian Government launched the Faster Adoption and Manufacturing of Hybrid and Electric Vehicles (FAME) scheme on April 1, 2015, to promote electric vehicles (EV) in the country. Its second phase, […] Read more
India’s EV Sector Attracts Rs. 25,000 Crore Investments Till July 2021 Updated On Mon, Aug 2nd, 2021 by Saurenergy Indian EV sector recorded Investments of approx. Rs. 25,000 crore during the first seven months of this year. The second wave of Covid-19 was highly destructive to almost every sector of the country. However, the electric vehicle (EV) and e-mobility sector says a different story, as it has witnessed numerous financial deals and investments. India’s e-mobility […] Read more
Safeguard Duty Update on Solar from Power Minister’s Press Conference Updated On Fri, Jul 30th, 2021 by Saurenergy In his first formal update on the issue of Safeguard Duty (SGD) on solar imports, that expired yesterday, Power and MNRE minister R.K. Singh had a completely new take on the way forward. He was responding to a specific question asked on the issue by Saur Energy Asserting that the best way out was to […] Read more
First Solar Signs Up For Make in India With 3.3 GW Manufacturing facility in India Updated On Fri, Jul 30th, 2021 by Saurenergy First Solar, Inc. (Nasdaq: FSLR) today announced that it intends to invest $684 million in a new, fully vertically-integrated photovoltaic (PV) thin film solar module manufacturing facility in India. Contingent upon permitting, and pending approval of Indian government incentives that are satisfactory to First Solar, the advanced facility is expected to commence operations in the second […] Read more