Panaji’s Green Vision: CM Pramod Sawant Targets 100% Renewable Energy Within a Year Updated On Mon, Aug 14th, 2023 by Saurenergy Chief Minister of Goa Pramod Sawant revealed on Saturday that the Ministry of New and Renewable Energy has set its sights on converting Panaji into a fully renewable energy-powered city within a year. Sawant stated, “The Ministry of New and Renewable Energy has designated Panaji for a complete shift to renewable energy, with the goal […] Read more
SJVN Bags Floating Solar Project of 90 MW in Madhya Pradesh Updated On Fri, Aug 11th, 2023 by Saurenergy SJVN Green Energy Ltd (SGEL) has bagged 90 MW capacity for the Omkareshwar floating solar project located in Madhya Pradesh. This is the second win for the said project for SJVN since the firm had also bagged 90 MW of the capacity for it in January 2023. The project has been won at INR 3.79 […] Read more
Norfund Pumps Repeat Investment into Fourth Partner Energy for ₹350 Cr Updated On Fri, Aug 11th, 2023 by Saurenergy Norwegian Investment Fund for developing countries – Norfund today announced a fresh investment of ₹350 Cr into renewable energy solutions platform, Fourth Partner Energy (4PEL). This is the second round of equity infusion by Norfund into 4PEL, following its $100 Mn investment in June 2021. Speaking about this development, Anders Blom, Vice President at Norfund […] Read more
North Canada to Welcome its Biggest Solar Plant from Mining Group Rio Tinto Updated On Fri, Aug 11th, 2023 by Saurenergy Spain’s mining group Rio Tinto’s Diavik Diamond Mine is set to establish the largest solar power plant across Canada’s territories. The plant will boast of more than 6,600 solar panels. The project will generate close to 4,200 MWh of carbon-free electricity annually for the mine. Commercial production from the operation is slated for completion in […] Read more
SJVN Invites Bids for BOS Package of 75 MW Solar Project Updated On Fri, Aug 11th, 2023 by Saurenergy SGEL (SJVN Green Energy Limited), a subsidiary of SJVN, has issued a tender for the BOS package for a 75 MW (AC) grid-connected solar PV power plant at Jamui in Bihar. The last day to submit bids is August 31, 2023. Bids open on August 31, 2023. The scope of work entails design, engineering, supply, […] Read more
SJVN Arm Issues Tender for BOS Supply, O&M for 200 MW Solar Project Updated On Thu, Aug 10th, 2023 by Saurenergy A subsidiary of SJVN, SJVN Green Energy Limited (SGEL) has issued a tender for the supply of a Balance of System (BOS) package. It also entails O&M services for a 200 MW solar project at Khavda Solar Park, Gujarat. The last date for the submission of bids is September 5, 2023. Bids open on September […] Read more
Statkraft in Agreement with Biopharmaceutical Firm for Offtake of Energy from Wind Farms Updated On Wed, Aug 9th, 2023 by Saurenergy Norway’s International Power Producer Statkraft has entered into a PPA with Sweden’s biopharmaceutical firm AstraZeneca towards energy procurement from three wind farms in Sweden. The PPA is based on the commissioning of the new wind farms in Strömstad and Årjäng, which is in Sweden’s bidding area 3 (SE3). This is also where AstraZeneca’s research and […] Read more
The Top 5: Improbable Energy Storage Possibilities Turned into Reality Updated On Wed, Aug 9th, 2023 by Saurenergy The storage for renewable energy in particular has become one of the main talking points in the energy industry across the globe for the sake of transition to a green future. Intermittent energy sources like wind and solar power often lack the ability, or fall short in their capacity, to accommodate postponed usage. Thus, there […] Read more
Tomorrow Water to Provide Wastewater Treatment System for US’ Largest Solar Production Unit Updated On Wed, Aug 9th, 2023 by Saurenergy California-based Tomorrow Water, a global environmental solutions provider, has been selected to design and deliver a wastewater treatment solution. The solution keeps compliance with the regions’ Publicly Owned Treatment Works pretreatment permit limits. Tomorrow Water met the requirements with its capability to provide a cost-effective solution promising a very aggressive turnaround schedule. The contract entails […] Read more