CATL and Quinbrook In Agreement for 10 GWh Stationary Battery Energy Storage Systems Updated On Thu, Nov 9th, 2023 by Saurenergy CATL and Quinbrook have announced the signing of a Global Framework Agreement in stationary storage with the aim to deploy 10GWh+ of CATL’s advanced storage solutions over the next five years,underlining their focus on using advanced storage solutions to meet energy transition goals. The long-term partnership includes the design, optimization, and supply of the most […] Read more
Haryana Releases Draft Solar Policy, Aims To Install 6GW RE Power Updated On Wed, Nov 8th, 2023 by Saurenergy The Haryana New and Renewable Energy Department has published its latest draft Solar Policy 2023. It has asked the stakeholders concerned to submit their opinion on the same within the next one month. In the latest draft note, the state renewable department aimed to install a cumulative 6000 Megawatt (MW) by 2030 in Haryana. The agency […] Read more
EU Solar Market Faces Challenges From China and US: ESIA Report Updated On Wed, Nov 8th, 2023 by Saurenergy The European Union’s (EU) industry association body, the European Solar PV Industry Alliance (ESIA), released a report that evaluates factors that can contribute to the de-risking and scaling up of Europe’s solar PV manufacturing. The alliance evaluates the factors affecting European industries, aiming to achieve the goal of 30 GW of domestic manufacturing capacity by 2025 and the EU’s […] Read more
Avaada Bags 1 GW in NHPC 3 GW Solar Tender; Jakson, Sprng Energy, Hinduja Among Other Winners Updated On Tue, Nov 7th, 2023 by Saurenergy In NHPC’s 3 GW tender for the selection of Solar Power Developer, Avaada Energy, Jakson, Sprng Energy, Hinduja Renewable Energy, Green Infra Wind Energy, Solairdirect Energy India, Hazel Hybren have emerged winners. Solairdirect Energy India is an arm of ENGIE, Green Infra Wind Energy and Hazel Hybren are subsidiaries of Sembcorp and Mahindra respectively. Avaada […] Read more
India’s Solar Module Manufacturing Capacity To Touch 60GW: Report Updated On Tue, Nov 7th, 2023 by Saurenergy A latest report from rating agency ICRA claimed that Indian solar module manufacturing could rise up to 60 Gigawatt (GW) by 2025. This is in contrast to the country’s current capacity of around 37 GW. The boost in the local solar module, as per the report, is likely due to the increased backward integration of […] Read more
Ciel & Terre Hands Over 10.765 MWp Floating Solar Project at Jamshedpur Plant To Tata Steel Updated On Mon, Nov 6th, 2023 by Saurenergy Tata Steel’s giant Jamshedpur works have added a small step towards becoming more sustainable with the completion of 10.75MWp Floating solar plant. Built by Ciel & Terre India, a subsidiary of the French floating solar leader, Ciel & Terre International, the project is India’s first floating solar installation within a steel power plant. According to […] Read more
Global Solar Investments Increased By 2% In Last 8 Years: Report Updated On Mon, Nov 6th, 2023 by Saurenergy A latest report by the International Solar Alliance (ISA) stated that global investment in solar increased by an average of around 2 percent over the last eight years. It added that, on the contrary, fossil fuels are still receiving a major share at nearly a trillion dollars annually. The report put the investment in the global energy sector […] Read more
Solar Helped Remote Hospitals Function Optimally: WRI Report Updated On Mon, Nov 6th, 2023 by Saurenergy A latest report from the WRI-India, a climate and energy think tank, claimed that clean power from solar energy fueled through Distributed Renewable Energy (DRE) systems boosted the capacity of remote healthcare centres nationwide. The report was titled ‘A Spoonful of Solar to Help the Medicine go Down’. WRI-India recently released the report in New Delhi recently. The […] Read more
NTPC REL Issues Tender for Substation Pkg for 630 MW Solar Park Updated On Fri, Nov 3rd, 2023 by Saurenergy NTPC Renewable Energy Limited (NTPC REL) has issued a tender inviting online bids from eligible bidders on single stage two envelope (envelope-I: techno-commercial bid and envelope-II: price bid) basis for substation package under development of 630 MW Barethi Solar Park. Brief Scope of Work 1. Design, engineering, supply, erection, testing and commissioning of- a. 400 […] Read more