Tamil Nadu government to install solar panels atop Chennai Corporation buildings Updated On Thu, Jun 22nd, 2017 by Saurenergy The solar panel will be installed on the top of Chennai Corporation buildings at a cost of Rs 39 crore from the Chennai Corporation fund Tamil Nadu government is reportedly gearing up to install solar panels on the top of Chennai Corporation buildings in a bid to tap 88 lakh units of power potential. Installing […] Read more
Sunworks to construct 1.1 Megawatt (MW) solar system at CSP Labs in Pleasant Grove, California Updated On Tue, Jun 20th, 2017 by Saurenergy CSP Labs will incorporate the 1.1 Megawatt (MW) solar system to offset more than 90% of its power consumption through long term partnership with Sunworks Sunworks, Inc. has announced a new project for a 1.1 Megawatt (MW) solar system that will be constructed at CSP Labs in Pleasant Grove, California. The 1.1 Megawatt (MW) solar […] Read more
Altus Power Acquires 6 MW Solar Project in California Updated On Tue, Jun 20th, 2017 by Saurenergy Altus Power notes that the solar project generates approximately 11 million kilowatt hours (kWh) of electricity annually, enough energy to power the equivalent of 800 homes Altus Power America, Inc. has announced the acquisition of a 6 megawatt (MW) DC ground-mounted single-axis tracker solar installation in Rancho Cordova, California. The solar energy system sells clean, […] Read more
Sterling and Wilson Scales New Heights; Gets Awarded the World’s Largest Solar Power Plant Updated On Tue, Jun 20th, 2017 by Saurenergy The solar power plant is jointly developed by Marubeni, a Japanese integrated trading and investment giant, along with Jinko, a global leader in the solar industry, and Abu Dhabi Water and Electricity Authority (ADWEA). Sterling and Wilson, one of the dominant global forces in the solar power space, has bagged Turnkey Engineering Procurement and Construction […] Read more
Central Railways floats tender for 1 MW rooftop solar project at Matunga in Mumbai Updated On Mon, Jun 19th, 2017 by Saurenergy Last date for the submission of the bid for 1 MW rooftop solar project at the Central Railways carriage workshop at Matunga in Mumbai is July 3, 2017 and the estimated project cost is Rs.80 million. The Central Railways recently floated tender for 1 MW rooftop solar project at the Central Railways carriage workshop at […] Read more
Renewable Energy Will Be Reaching 49 percent in India by 2040: BNEF Updated On Mon, Jun 19th, 2017 by Saurenergy “Wind and solar energy account for 48 percent of installed capacity and 34 percent of electricity generation world-wide by 2040. This is compared with just 12 percent and 5 percent today. Installed solar capacity increases 14-fold and wind capacity fourfold by 2040. We anticipate renewable energy reaching 74 percent penetration in Germany, 38 percent in […] Read more
30 promoters get government’s approval to conduct survey for180 MW solar power project Updated On Sat, Jun 17th, 2017 by Saurenergy Nepal Electricity Authority is in the process of signing PPA with promoters to commission solar project with total capacity of producing 61 MW solar powers. Nepal government has recently given approval to as many as 30 promoters to conduct survey for the commissioning of 180 MW solar power project in different part of the country. […] Read more
Andhra Pradesh gearing up to store solar power for farmers: Report Updated On Fri, Jun 16th, 2017 by Saurenergy Andhra Pradesh will become the first state in the country and Asia to store solar energy to facilitate power supply to agriculture sector Andhra Pradesh is reportedly gearing up to store solar power for the farmers in the state. The Pioneer reports that Andhra Pradesh will become the first state in the country and Asia […] Read more
Panasonic partners with Pika Energy to Offer Harbor Smart Battery for Solar-Plus-Storage Updated On Fri, Jun 16th, 2017 by Saurenergy Powered by Panasonic’s Li-Ion battery technology, Harbor smart battery provides 10kWh or 15kWh of usable energy and up to 6.7kW of continuous power. Harbor 10P/15P can be used for clean back-up power, self-supply, time-of-use and other solar-plus-storage applications. Panasonic Eco Solutions and U.S. based inverter manufacturer – Pika Energy have partnered to offer the Harbor […] Read more