Technician- Maintenance Updated On Fri, Jun 21st, 2024 by Saurenergy Responsible for installing, troubleshooting (Emergency Repair) and maintaining of production tools in the lines. This includes Preventive, Predictive & Repair Maintenance activities for all manufacturing production tools such as electrical systems, motors, vacuum pumps, conveyors, Robots, and material handling machines. Ensure assigned PM – Job Plans and Work Orders from CMMS system are carried out […] Read more
Lead- Warehouse Operations and Materials Updated On Fri, Jun 21st, 2024 by Saurenergy Develops a globally aligned warehouse strategy for the site to drive a lean, efficient warehouse covering BOM, Spares, Consumables and Finished Goods. This includes driving an efficient and effective distributions of parts mentioned above between sites, which is cost effective. Responsible for the overall performance of the warehouse and inventory control functions; includes FG shipments, […] Read more
Smarter E AWARD – Photovoltaics Category 2024 Winners Announced Updated On Fri, Jun 21st, 2024 by Saurenergy The Smarter E AWARD 2024 has been announced, celebrating a new set of winners who are transforming the dynamics of energy and mobility through their innovative products and solutions. The Smarter E AWARD seeks to honour concepts and technologies that contribute to a 24/7 renewable energy supply. The award encompasses five categories: Photovoltaics, Energy Storage, […] Read more
Material Quality – Electrical + Mechanical TL_SM Updated On Fri, Jun 21st, 2024 by Saurenergy PRINICIPAL ACCOUNTABILITIES:- Review & approval of supplier documents, MQP, Type tests , inspection reports of Steel Coils, Module mounting structures, Transmission Tower structures, various Conductors for Transmission, Construction steel, Robotic cleaning systems etc . Inspection and testing of above items by self and through TPIAs. Conducting, co ordinating and planning supplier/factory audits, product inspections and […] Read more
Amara Raja Invests €20mn to Increase Stake In Battery Tech Firm InoBat Updated On Fri, Jun 21st, 2024 by Saurenergy Battery manufacturer Amara Raja Energy & Mobility (ARE&M) has further invested EUR 20mn, which includes a subscription for an additional 4.5% equity stake in InoBat AS, Norway. With the above, Amara Raja Energy & Mobility Limited’s total holding will be around 9.32% of its equity stake in InoBat AS, including its previous investment of EUR […] Read more
Waaree Energies Secures 280 MW Order From Mahindra Susten Updated On Thu, Jun 20th, 2024 by Saurenergy Waaree Energies Limited, an Indian solar PV module manufacturer with an aggregate installed capacity of 12 GW, as of June 30, 2023 (Source: CRISIL Report), signed an agreement with Mahindra Susten. This agreement with renewable independent power producer (IPP), was undertaken to supply 280 MW (DC) of advanced solar modules in Bikaner, Rajasthan. The contract […] Read more
JSW MG Motor India Partner Ecofy For EV Financing Updated On Thu, Jun 20th, 2024 by Saurenergy JSW MG Motor India have announced that it partnered with Eversource Capital-backed NBFC Ecofy to provide financing and leasing solutions for its electric vehicles. According to a release, the two businesses have inked a Memorandum of Understanding (MoU) under which Ecofy will offer leasing and financing options for up to 10,000 JSW MG EVs over […] Read more
Associate Tech Lead – Electrical Engineering Updated On Thu, Jun 20th, 2024 by Saurenergy Associate Tech Lead will work as part of the Electrical Engineering team and have responsibility for the design and development of Electrical Subsystems for various product lines (New Product Developments (NPD), Quality improvement and Productivity projects). The role will have strong focus on new technologies, processes and applying these technologies to various product lines. Responsibilities:- Design […] Read more
Vestas Gets 577 MW Order For 1.3 GW Australia Wind Project Updated On Wed, Jun 19th, 2024 by Saurenergy Vestas has been awarded the Engineering, Procurement, and Construction (EPC) for the second stage of Golden Plains Wind Farm in Australia. The second stage will feature 93 of Vestas’ V162-6.2 MW wind turbines from the EnVentus platform. Vestas is currently delivering the 756 MW EPC contract for the first stage. The extension will provide an […] Read more