SUBSCRIBE NEWS LETTER

seci

SECI Issues Tender For 2000 MW Solar Projects Under CPSU-II

The projects will be developed on a Build-Own-Operate basis and the usages charges to be paid by the govt entities for the power has been set at a maximum of Rs 3.50/kWh. The Solar Energy Corporation of India (SECI) has issued a Request for Selection (RfS) document for the selection of Solar Power Developers (SPD) for […]

Read more

SECI Extends Deadline For 3 GW Manufacturing Linked Solar Tender

The deadline for submission has been extended from March 18, 2019, to April 4, 2019. The Solar Energy Corporation of India (SECI) has extended the deadline for bid submission on its tender for setting up 3 GW ISTS-Connected solar PV power plant linked with setting up of 1.5 GW (per annum) solar manufacturing plant. The […]

Read more

SECI Issues Three NITs to Set-Up Solar Projects in UP, MP, Andhra

The detailed Request for Selection Document (RfS) for all the three solar power projects in UP, MP and AP respectively will be available for download for interested bidders latest by April 30, 2019. The Solar Energy Corporation of India (SECI) has issued three Notice Inviting Tenders (NITs), inviting online bids for the development of solar PV […]

Read more

Tenders For 400 MW of Floating Solar Projects Issued by SECI

SECI has issued two NITs for the development of floating solar projects of 400 MW capacity in Jharkhand and Tamil Nadu. The Solar Energy Corporation of India (SECI) has issued two Notice Inviting Tenders (NITs), inviting bids for the development of floating solar PV power projects of 400 MW cumulative capacity in Ranchi, Jharkhand and […]

Read more

SECI Issues NITs For 1250 MW of Solar Projects in Rajasthan and Tamil Nadu

The 1250 MW tendered capacity will be developed in the states of Rajasthan (750 MW) and Tamil Nadu (500 MW). The Solar Energy Corporation of India (SECI) has issued two Notice Inviting Tenders (NITs), inviting bids for the development of solar projects of 1250 MW capacity in Rajasthan and Tamil Nadu. The first NIT has been […]

Read more

SECI Issues RfS For 97.5 MW Rooftop Solar Scheme For Govt Buildings

The ceiling tariff for general category states and union territories and for special category states and Islands is Rs 3.50/kWh. The Solar Energy Corporation of India (SECI) has issued the Request for Selection Document (RfS) for the implementation of the 97.5 MW of grid-connected rooftop solar PV projects for government buildings in different states and […]

Read more

SECI Seeking Owners Engineer For Andhra Pradesh Hybrid Project

The last date of submission of the EoI is March 25, 2019. The Solar Energy Corporation of India (SECI) has issued an Expression of Interest (EOI) for the selection of owners engineer for the 160 MW solar-wind hybrid power plant with Battery Energy Storage System (BESS) at Ramagiri, Anantapur District, Andhra Pradesh. The selection of […]

Read more

SECI Issues 2 NIT’s For 1200 MW Solar PV Projects (ISTS- IV and V)

The detailed RfS for both the tenders will be available for downloading latest by March 08, 2019. The Solar Energy Corporation of India (SECI) has issued two Notice Inviting Tender (NITs) inviting online bids for setting up of 1200 MW ISTS Connected Solar Power Projects (ISTS-IV) on a pan India basis, and for setting up of […]

Read more
      SUBSCRIBE NEWS LETTER
Scroll