Cabinet to install 15,000Mw Grid Connected Solar PV Power with NTPC Updated On Wed, Dec 16th, 2015 by Saurenergy The Cabinet in a row to revive the National Solar Plan accredited the scheme of installing 15,000Mw Grid connected Solar PV Power through NTPC across three tranches. The Three Tranches will be: 3000 MW under Tranche-l under component of Packaging with Unallocated Coal based Warm Power and settled levies 5,000 MW under Tranche-ll with some […] Read more